質問 1:An administrator wants to view VMs with NGT Installed and Filter by their installed guest operating systems.
How can this task most quickly be accomplished within prism central?
A. Create a customer Focus using the OS Column
B. Use a pre-defined Prism Central report
C. In the VM dashboard , filter by the nutanix Guest tools - OS field
D. use the Prism central analysis Panel to create a pie chart by OSType
正解:C
質問 2:An Administrator is concerned that a VM on a hybrid Cluster with 8Gb RAM and 4 vCPU is performing poorly.
An Analysis of the VM indicates that CPU Utilization is at 50% ,memory utilization is at 30% , and disk latency is at 18ms.
What can the administrator do to improve performance?
A. add 4GB RAM
B. Enable FLash Mode
C. Increase vDisk Size
正解:A
質問 3:An administrator is managing two AHV and vSphere-Based Clusters. The administrator is able to install a Windows Guest OS from an ISO Image to VMWare VMs , but is unable to do the same activity with AHV VMs.
What should the administrator do to successfully perform this action with AHV VMs?
A. Manag Nutanix Guest tools
B. Verify cluster iSCSI data Services IP
C. Provide virtIO Drivers
D. Change VM Setting From BIOS to UEFI
正解:C
質問 4:A VDI environment based on AHV Cluster is not performing well. The current environment is using only one bridge (Bridge0). The administrator needs to verify if nodes are using all network cards associated to Bridge0.
Which two menus should be used to check the current configuration? (Choose two.)
A. Host NICs tab in Hardware menu
B. Network Configuration item in Settings menu
C. Host view in Network menu
D. I/O Metrics tab in VM menu
正解:A,C
質問 5:Refer to the exhibit.

A Nutanix host is connected as shown in the exhibit with br0-up set to active/backup. Physical Switch 1 experiences a power outage causing br0-up to failover to using eth2. The CVM and host become inaccessible. User VMs restart on other hosts in the cluster, which causes a disruption to those VMs.
Which configuration issue likely caused this outage?
A. Bridge br0-up should be configured to use balance-tcp rather than active/backup.
B. The upstream port for eth2 is missing a VLAN.
C. The CVM should have eth1 connected to the OVS.
D. The user VMs only have one NIC
正解:B
質問 6:Over the period of 2 to 3 weeks, a cluster displays the following:
* Periods where Warning Alerts of memory usage over 75% are asserted
* Periods where Critical Warnings of memory usage over 90% are asserted
* Periods of slow of frozen VDI desktops have caused work stoppage or slowdown
* VDI clones have periodically not powered up when called, causing work stoppage Which steps should be used to prioritize the administrator's troubleshooting efforts?
A. * Assess resource health on Hardware page
* Review the Analysis page for memory usage demand
* Determine the VDI workload-to-host affinity across the cluster
B. * Analyze Alert Pages for a root cause of memory problem
* Analyze VM table page to access the VM functionality
* Analyze the VDI Clone properties for possible VDI Workload stress
C. * Review Analysis Page for memory use pattern
* Alert with VDI workload demand
* Analyze current and future workload in the Capacity Runaway tab for sufficient resources
D. * Check Analysis page for CPU demand
* Verify VDI workload property for memory subscription
* Review the Hardware page to determine if the cluster has sufficient RAM
正解:C
質問 7:An administrator responsible for a VDI environment needs to investigate reports of slow logins. The administrator finds that increasing the number of vCPUs from 2 to 4 will reduce the login times. Production workloads are consuming 75% of the host CPU on the cluster. The administrator increases the vCPU count on all of the VDI VMs.
What are two impacts on the cluster? (Choose two.)
A. Increase CPU utilization%
B. Increase CPU ready%
C. Increasing CPU counts will decrease memory utilization
D. Increase memory utilization%
正解:C,D
質問 8:An administrator is deploying an application using Nutanix Volumes. After configuring the volume group and connecting the guest's iSCSI initiator to the volume group, they begin performance testing.
The administrator learns that performance on the virtual disk attached to the iSCSI initiator is far less than that of a virtual disk connected directly to the VM.
Which situation is causing this condition?
A. The performance test is generating small block random 10.
B. Data Locality ensures that VM attached disks are always faster than iSCSI volumes.
C. The duster data services IP address is a bottleneck, shared with other iSCSI traffic
D. The VM's iSCSI traffic is being routed to the data services IP subnet
正解:C
弊社は無料Nutanix NCM-MCI-5.20サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料NCM-MCI-5.20サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのNCM-MCI-5.20問題集は自分に適するかどうか判断して購入を決めることができます。
NCM-MCI-5.20試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
一年間の無料更新サービスを提供します
君が弊社のNutanix NCM-MCI-5.20をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたNutanix NCM-MCI-5.20をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のNutanix NCM-MCI-5.20を持っていることを保証します。
Nutanix NCM-MCI-5.20 認定試験の出題範囲:
トピック | 出題範囲 |
---|
トピック 1 | - Given a scenario, troubleshoot issues using alerts and
- or logs
- Given a scenario, upgrade firmware
|
トピック 2 | - Given a scenario, implement Nutanix Volumes
- Given a scenario, implement Nutanix Files
|
トピック 3 | - Configure security to leverage external authentication
- authorization resources
- Given a scenario, secure workloads
|
トピック 4 | - Validate Disaster Recovery configurations
- Configure Data Protection to meet corporate HA
- DR requirements
|
トピック 5 | - Given a scenario, troubleshoot connectivity issues
- Configure security for Nutanix Enterprise Clouds
|
トピック 6 | - Given a scenario, optimize performance for specific workloads
- Configure infrastructure for workloads
|
トピック 7 | - Evaluate Capacity Runways to predict growth
- Given a scenario, maintain Nutanix cluster health
|
トピック 8 | - Given a scenario, troubleshoot network visualizations
- Configure networking for optimal performance
|
トピック 9 | - Given a scenario, troubleshoot performance issues
- Given a scenario, analyze cluster performance
|
参照:https://www.nutanix.com/support-services/training-certification/certifications/certification-details-nutanix-certified-master-multicloud-infrastructure
弊社のNutanix NCM-MCI-5.20を利用すれば試験に合格できます
弊社のNutanix NCM-MCI-5.20は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はNCM-MCI-5.20問題集の質問と答えが間違いないのを保証いたします。

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のNutanix NCM-MCI-5.20を利用すれば、君は一回で試験に合格できます。
TopExamは君にNCM-MCI-5.20の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
弊社は失敗したら全額で返金することを承諾します
我々は弊社のNCM-MCI-5.20問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のNutanix NCM-MCI-5.20を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のNCM-MCI-5.20問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。