質問 1:The test team is using a distributed model for testing.
What is the primary factor you should consider with this model? [1]
A. Co-location of test team
B. Planned vs. actual hours
C. Alignment of methodologies
D. Provision of growth opportunities for the individual testers
正解:C
解説: (Topexam メンバーにのみ表示されます)
質問 2:You are a new Test Manager on a maintenance release for an existing mature product that is expected to be retired in the not too distant future. The previous release had utilized a performance regression test suite written in an in-house custom tool using the same programming language as the product itself. This suite will most likely require tweaking to ensure it works with the new version of the product. While there are several members in the performance testing team, the original author of the performance testing tool has moved on to another company, and none of the remaining staff have a great deal of familiarity with the performance test scripts used to test this product.
How would you recommend this scenario be addressed? [3]
A. Retire the in-house tool and switch to a vendor supported tool for performance testing.
B. Make the in-house tool available to the open source community.
C. Leverage the development team to fill any knowledge gaps in the in-house tool.
D. Reduce the scope of the product testing to exclude performance testing.
正解:C
解説: (Topexam メンバーにのみ表示されます)
質問 3:Which of the following is a typical use of risk analysis? [1]
A. Forecasting the product delivery date
B. Determining the design of the tests used to mitigate each identified risk
C. Identifying the appropriate depth of testing for each identified risk
D. Deciding what personnel should be assigned to which tests
正解:C
解説: (Topexam メンバーにのみ表示されます)
質問 4:You have just conducted a skills assessment for your team. You decided to rate everyone from 1 to 5 in the skill areas as follows:
5 = expert
4 = proficient
3 = can use this skill effectively but will need some assistance
2 = interested in learning this skill but has only minimal knowledge
1 = not interested in learning this skill
Given these values, you have rated your team as shown in the table below for the designated skill areas:
You will be starting to test a new product that is an upgrade from one of your existing end user products. Your testing will include white box, performance, security, usability, and black box. You also have a goal to automate 100% of the smoke test and
50% of the regression tests by the end of the release.
Your team willingly shares knowledge and conducts regular lunch time cross-training sessions.
Your manager wants to know if you would like to bring in someone to help train your team in preparation for this project. In which area could you best utilize this help? [3]
A. Training in automation
B. Training in domain knowledge
C. Training in customer support
D. Training in black box techniques
正解:A
解説: (Topexam メンバーにのみ表示されます)
質問 5:You are the Test Manager on a new project. The schedule is aggressive and will require the team to work at peak efficiency. The requirements are not well defined yet, but it is clear that the project will be using new technologies. To help the developers meet the development schedule, an offshore group will be added to the development team.
At this time there is not enough budget to add more testing resources. The project stakeholders are very concerned about the quality of delivered product and will be watching the project closely, particularly during the testing cycles. The exit criteria from the system test level require no open high priority/severity defects, 100% pass rate for all test cases covering risks that are classified as
"high" or "very high", 90% pass rate for all "medium" risks and 50% pass rate for all "low" and "very low" risks.
Given this information, which lifecycle model should you recommend?[3]
A. Iterative/incremental
B. V-model
C. Spiral
D. Waterfall
正解:A
解説: (Topexam メンバーにのみ表示されます)
質問 6:When closing out a defect report, which of the following developer commentaries is most likely to motivate a tester? [1]
A. Rejected - system is functioning as designed
B. Fixed - error in build caused compatibility issues
C. Rejected - would take too long to fix
D. Fixed - minor usability issue, wasn't worth the time to fix it
正解:B
解説: (Topexam メンバーにのみ表示されます)
質問 7:Which of the following software characteristics are possibly revealed through the application of a open source static analysis tool? [1]
A. Timing dependencies
B. Coding standard violations
C. Memory leaks
D. Concurrency thresholds
正解:B
解説: (Topexam メンバーにのみ表示されます)
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のCTAL-TM問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
弊社のISQI CTAL-TMを利用すれば試験に合格できます
弊社のISQI CTAL-TMは専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はCTAL-TM問題集の質問と答えが間違いないのを保証いたします。
この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のISQI CTAL-TMを利用すれば、君は一回で試験に合格できます。
一年間の無料更新サービスを提供します
君が弊社のISQI CTAL-TMをご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたISQI CTAL-TMをお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のISQI CTAL-TMを持っていることを保証します。
弊社は失敗したら全額で返金することを承諾します
我々は弊社のCTAL-TM問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のISQI CTAL-TMを利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
TopExamは君にCTAL-TMの問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
弊社は無料ISQI CTAL-TMサンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料CTAL-TMサンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのCTAL-TM問題集は自分に適するかどうか判断して購入を決めることができます。
CTAL-TM試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
ISQI ISTQB Certified Tester Advanced Level - Test Manager 認定 CTAL-TM 試験問題:
1. Your test process is fully integrated into the software development lifecycle. You are at which TMMi level?
[1]
A) Defined
B) Managed
C) Optimized
D) Initial
2. Which of the following organizational structures would be considered unorthodox? [1]
A) Developers within the same team unit test each others' code prior to handing over to a separate testing team for system testing
B) DBAs confirm the referential integrity of the database and developers complete their unit testing before handing over to external organization for system testing
C) After developers are done unit testing, business analysts alpha test the system before handing over to a separate testing team for system testing
D) Developers and testers are integrated within the same project team, each role focusing on a different level of testing
3. Your test team has created a custom automation tool that will be used for an upcoming release. Now that the tool has been coded, what should be the next step? [1]
A) Test the tool
B) Compare the new tool to open source tools
C) Perform an ROI study
D) Create the tool support guide
4. When scheduling performance testing, which of the following approaches would be most advisable? [1]
A) Requiring all performance tests to pass before starting functional testing
B) Leveraging end users to do unit-level performance testing and automated tools for system-level performance testing
C) Starting the performance testing during unit and integration testing
D) Deferring the start of performance testing until all functional defects have been resolved
5. What is a "depth-first" risk-based testing technique? [1]
A) Non-functional test cases are executed first
B) All risk items are tested at least once
C) Highest risk test cases are executed first
D) Lowest risk test cases are executed first
質問と回答:
質問 # 1 正解: A | 質問 # 2 正解: C | 質問 # 3 正解: A | 質問 # 4 正解: C | 質問 # 5 正解: C |