HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

IBM A2180-608 問題集

A2180-608

試験コード:A2180-608

試験名称:Assessment: IBM WebSphere Process Server V7.0, Deployment

最近更新時間:2025-01-05

問題と解答:全65問

A2180-608 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥5999 

無料問題集A2180-608 資格取得

質問 1:
In a company all the applications deployed in a WebSphere Process Server network deployment environment extensively leverage asynchronous messaging with JMS bindings. There is a requirement to resubmit the messages in case of infrastructure failures or planned shutdown. What is the suggested message reliability level that could be proposed in this situation?
A. Reliable non-persistent
B. Assured persistent
C. Reliable persistent
D. Best effort non-persistent
正解:B

質問 2:
A deployment professional is installing an application which uses business processes in a clustered WebSphere Process Server environment. The Business Process Choreographer (BPC) container has previously been configured. During which phase of the installation is the application validated?
A. During the installation phase on the node agent.
B. During the application start phase on the application server.
C. During the installation phase on the deployment manager.
D. During the configuration phase on the application server.
正解:C

質問 3:
A deployment professional is performing a review of the audit and logging practices being used. One of the items under review is the current level of logging configured for the Human Task Manager. The site database administrator requires that any changes made which affect the amount and type of data being stored to the database must be reviewed and approved prior to implementation. Which of the following log settings would impact the data stored to the database?
A. Failed event logging
B. Audit logging
C. Task history logging
D. Common Event Infrastructure (CEI) logging
正解:B

質問 4:
Select the BEST order for creating a standalone profile for WebSphere Process Server 7.0.
A. Install the product -> Run installer_wbi checksum tool -> Create profile -> Perform Installation Verification test
B. Install the product -> Create profile -> Perform Installation Verification test -> Run installver_wbi checksum tool
C. Install the product -> Perform Installation Verification test -> Create profile -> Run installver_wbi checksum tool
D. Install the product -> Create profile -> Run installer_wbi checksum tool -> Perform Installation Verification test
正解:A

質問 5:
A deployment professional is configuring the Common Event Infrastructure (CEI) event service in a clustered environment. The deployment professional has chosen to use the wbmDeployCEIEventService command to install the CEI event service on the cluster and to create the required resources (service integration bus and messaging engine). Which parameter is required when installing the event service into the clustered environment?
A. -clusterName
B. -dataStore
C. -eventService
D. -busMember
正解:D

質問 6:
A retail company has the requirement to make frequent changes to a long running MyProcessDiscount business process as newer versions of that process are introduced due to changing business needs. What approach should a deployment professional adopt to meet this requirement?
A. Stop the older version of the MyProcessDiscount process template from the Integrated Solutions Console (ISC), install the application containing the newer version of the business process template.
B. Use the Business Process Choreographer Explorer, if you see any running instances of older version of MyProcessDiscount process template, wait till all the instances of that version of the template are completed, then remove the older version of the business process template and install the newer version of the business process template.
C. Install the application containing the newer version of MyProcessDiscount process template, then using the Business Process Choreographer Explorer, monitor the state of the running process instances and, when execution is in the appropriate place in the flow of the business process, select the business process instances based on the older template only to migrate to the newer version.
D. Use the Business Process Choreographer Explorer, select all the running instances with name MyProcessDiscount business process, then choose the Migrate option to migrate all instances to the currently valid version of the business process template.
正解:C

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のA2180-608問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

一年間の無料更新サービスを提供します

君が弊社のIBM A2180-608をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたIBM A2180-608をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のIBM A2180-608を持っていることを保証します。

弊社は無料IBM A2180-608サンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料A2180-608サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのA2180-608問題集は自分に適するかどうか判断して購入を決めることができます。

A2180-608試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

TopExamは君にA2180-608の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

弊社は失敗したら全額で返金することを承諾します

我々は弊社のA2180-608問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のIBM A2180-608を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

弊社のIBM A2180-608を利用すれば試験に合格できます

弊社のIBM A2180-608は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はA2180-608問題集の質問と答えが間違いないのを保証いたします。

A2180-608無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のIBM A2180-608を利用すれば、君は一回で試験に合格できます。

IBM Assessment: IBM WebSphere Process Server V7.0, Deployment 認定 A2180-608 試験問題:

1. A company has deployed Business Space for the call center department. The call center department provides many non-personalized computer terminals due to working hour shifts and rotating employees. Users needing read access complain that there is no consistent view for their pages and that the interface changes regularly. Which of the following is the BEST approach for a deployment professional to address the problem?

A) Create a Business Space template for each user and add the respective user to the Owner security role to allow customization.
B) Create a repository and allow all users to export and re-import their customized Business Spaces.
C) Create a Business Space page including all necessary widgets and share the page with all users by assigning the Editor security role.
D) Create a Business Space template including all necessary widgets and assign all users to the Viewer security role.


2. A new customer to WebSphere Process Server has used adapters in several modules. There are many more modules in development that use adapters on their way to production. The customer is worried about resource consumption when all the modules are running. What should the deployment professional investigate about the use of the adapters?

A) Is the same type of adapter used at different version levels?
B) Is the same connection pool used for each of the adapters?
C) Is the same type of adapter used more than once?
D) Are technology adapters or EIS adapters used?


3. A deployment professional has created a Remote Messaging and Remote Support cluster with DB2 as the database including an application cluster (cluster1). This environment is used for testing the solution1 project. For another project, solution2, the development team requests another cluster (cluster2). The deployment professional decides to add another application cluster (cluster2) and another messaging cluster to the environment in order fulfill this requirement. What should the deployment professional do as part of this task, given that business processes from the new solution2 project will be called as services from the solution1 project modules?

A) Use a new database/schema for the BPEDB and the CommonDB for cluster2.
B) Use a new database/schema for the BPEDB required for cluster2.
C) Use the existing database/schema from cluster1 for the BPEDB required for cluster2.
D) Use the existing database/schema from cluster1 for the BPEDB and the CommonDB required for cluster2.


4. During the design of a large-scale high-volume topology, a deployment professional is consulting with a client on the planned design and configuration of the databases required for the messaging resources. During this discussion the deployment professional notes that it would be preferable to configure a separate database for the Business Process Choreographer (BPC) messaging engine. What is a reason for making such a suggestion?

A) All of the components require the database schema to be named MEDBPM00.
B) Database logging could become a performance bottleneck.
C) Shared databases between the BPC and the SCA bus are not supported in production environments.
D) The separate database is created automatically in a network deployment environment.


5. A deployment professional has been asked to review the backup plan of a WebSphere Process Server (WPS) Network Deployment installation with a standard Remote Messaging and Remote Support two node cell. The deployment professional has noticed that the databases are backed up on a different cycle and separate from the transaction logs. Predict the consequences during a database recovery from backup.

A) WPS must be restarted in recovery mode to automatically synchronize database and transaction logs.
B) WPS transaction logs will have to be manually edited to remove transaction that occurred after the backup.
C) WPS will automatically synchronize database and transaction logs during normal startup.
D) WPS may not start up normally because the database and transaction logs backup are not synchronized.


質問と回答:

質問 # 1
正解: D
質問 # 2
正解: C
質問 # 3
正解: B
質問 # 4
正解: B
質問 # 5
正解: D

A2180-608 関連試験
A2180-605 - Assessment: IBM WebSphere Enterprise Service Bus V7.0, Integration Development
A2040-920 - Assessment: IBM WebSphere Portal 7.0 Deployment and Administration
A2180-606 - Assessment: IBM WebSphere Business Modeler Advanced Edition V7.0, Business Analysis and Design
P9530-039J - IBM WebSphere MQ Technical Sales Mastery Test v2 (P9530-039日本語版)
A2180-607 - Assessment: IBM WebSphere Process Server V7.0, Integration Development
連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。