質問 1:Select the three correct repositories available In ASCP.
A. Oracle Application Data Store
B. Planning Data Store
C. Operational Data Store
D. Item Data Store
E. Resource Data Store
F. Bills of Material (BOM) Data Store
G. Processing Data Store
正解:B,C,E
質問 2:Identify two statements that are true for Forecast Consumption.
A. Current Forecast equals Original Forecast plus Customer Orders.
B. Forecast Consumption Is the process of Increasing a Forecast quantity by the quantity of a Sales Order that the Forecast expects.
C. Forecast Consumption Is the process of decreasing a Forecast quantity by the quantity of a Sales Order that the Forecast expects.
D. Current Forecast equals Original Forecast less Customer Orders.
正解:A,C
質問 3:Identify the five correct Forecast elements In Advanced Supply Chain Planning.
A. Item numbers
B. Dates
C. Lead times
D. Resources
E. Original quantities
F. Current quantities
G. Sources
正解:B,D,E,F,G
質問 4:Your client currently has two manufacturing plants, plants, four Inventory locations, and one distribution center. When doing the future state analysis, the Operations Directory at the client site said that they have expansion plans after the go-live of the current Oracle in Implementation. They plan to add 10 more distribution centers and these can be transfer of goods between any two distribution centers. Each distribution center would need to optimize its inventory level and forecasts will be handled in Demand Planning for better customer satisfaction.
The client IT Manager proposes to use one main inventory Organization to represent all the facilities and use sub inventories to represent the various inventory locations in the manufacturing plant and the distribution center. The future distribution centers can be modeled as subinventories because Oracle allows you to define a large number of subinventories. From the system point of view, It will be easier to maintain and inventory transfers between sub inventor using Move Orders are possible.
Select three correct statements about the above scenario.
A. You design the same way and you also add more transaction types to take care of future transfers between any two distribution centers.
B. You design the same way as the client IT Manager because It will fulfill all the requirements of the client.
C. Inventory Optimization does not calculate safety stock at the subinventory level. So the client needs multiple inventory Organizations.
D. Global Order Promising can calculate availability at the subinventory level, so you need one inventory Organization with multiple subinventories.
E. You design multiple inventory Organizations to model this so that in future when the client needs to plan a transfer from one facility to another, ASCP will be able to suggest such a transfer.
F. Demand Planning forecasts by Organization, not by subinventory. So the client needs multiple inventory Organizations.
正解:A,C,E
質問 5:In a combination of forecasts for one Item, the Planning Manager consumes forecast entries according to the following procedural list:
1. It consumes the entries on the sales order line schedule date (or within the same week or period).
2. It consumes the entries on the forward consumption days (or within the same week or period).
3. It consumes the entries on the backward consumption days (or within the same week or period).
Note: No other setups are performed for consumption. Identify the correct order of consumption.
A. 1, 2, 3
B. 3, 2, 1
C. 1, 3, 2
D. 3, 1, 2
E. 2, 1, 3
F. 2, 3, 1
正解:D
質問 6:Your client received some plan-related constraint exception messages. Identify two such messages.
A. Order Is firmed early
B. Order causes supplier capacity overload
C. Transportation volume constraint
D. Requirement with insufficient lead time
E. Requirement is firmed late
F. Requirement causes resource overload
G. Order lead time constraint
正解:B,G
質問 7:Exhibit.
You define a Supply Chain plan of type "Manufacturing Plan." In the Plan Options Main tab, you select Planned Items as "Demand schedule items and all sales orders" and select the Include Critical Components check box.
The Exhibit shows Bills of Material for Items A and
B. It also shows the settings for the Include Sales Order check box on the Plan Options Organizations tabbed page.
Item A has Demand Schedules and Sales Orders for Organizations Ml and M2. Item B has only Sales Orders for Organizations Ml and M2.
Which three statements are correct in the above plan scenario?
A. The critical components of Items A and B (Al, A3, and B3) along with the sandwiched Items A2 and B2 are planned in both Organizations. The noncritical components (A4, B1, and B4) are Ignored.
B. Item A with Demand Schedules in Organizations Ml and M2 is planned.
C. Sales Order demands of Items A and B for Organization Ml are planned and for Organization M2 are ignored.
D. All components of Items A and B are planned in both Organizations.
E. The critical components of Items A and B (Al, A3, and B3) are planned. The sandwiched Items (A2 and B2) and the noncritical components (A4, B1, and B4) are Ignored.
正解:A,B,C
質問 8:The following list contains possible places the Planning engine will check for Penalty Factors for Late Demand In an Optimized Plan:
1. At the Plan Option Level
2. Flexfield at the Item Level
3. At the System Profile Level
4. Flexfield at the Demand Level
5. Flexfield at the Organization Level
Identify the correct sequence.
A. 3, 1, 5, 2, 4
B. 2, 4, 5, 3, 1
C. 1, 2, 3, 4, 5
D. 2, 5, 4, 1, 3
E. 4, 5, 2, 3, 1
F. 4, 2, 5, 1, 3
正解:F
弊社は失敗したら全額で返金することを承諾します
我々は弊社の1Z0-244問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のOracle 1Z0-244を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社の1Z0-244問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
TopExamは君に1Z0-244の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
弊社は無料Oracle 1Z0-244サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料1Z0-244サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこの1Z0-244問題集は自分に適するかどうか判断して購入を決めることができます。
1Z0-244試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
一年間の無料更新サービスを提供します
君が弊社のOracle 1Z0-244をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたOracle 1Z0-244をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のOracle 1Z0-244を持っていることを保証します。
弊社のOracle 1Z0-244を利用すれば試験に合格できます
弊社のOracle 1Z0-244は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社は1Z0-244問題集の質問と答えが間違いないのを保証いたします。
この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のOracle 1Z0-244を利用すれば、君は一回で試験に合格できます。
Oracle EBS R12: Advanced Supply Chain Planning 認定 1Z0-244 試験問題:
1. Identify four correct statements about the Plan Options Constraints Tab setup.
A) If Enforce Purchasing Lead-times Is selected, lead times are enforced only in the first bucket.
B) Check Constrained Plan to Invoke the High Level Scheduler.
C) All constrained plans calculate resource requirements.
D) You must select a primary constraint-"Enforce Demand Due Dates" or "Enforce Capacity Constraints."
E) A "Yes" cannot be entered to the right of a "No" in the same row of resource and material constraints.
F) The scheduling horizon is independent of the planning horizon.
2. You are Integrating Oracle Distribution Planning with other Oracle Advanced Planning Suite products.
To which Oracle Advanced Planning Suite product does Distribution Planning provide a statement of product availability?
A) Oracle Production Scheduling
B) Oracle Collaborative Planning
C) Oracle Advanced Supply Chain Planning
D) Oracle Global Order Promising
E) Oracle Inventory Optimization
F) Oracle Demand Planning
3. Determine the correct hierarchy used by the planning engine when using a priority rule.
1. Plan priority rule: Plan options form > Main tabbed region
2. Default Priority Rule: Priority rules form
3. Schedule Date: Prioritizes the demands In due date order
A) 1, 2, 3
B) 2 , 3 ,1
C) 3 , 2 , 1
D) 1 & 2 only
4. Select four correct Pegging methods available In ASCP.
A) Department Pegging (applicable to all Items that use this Department)
B) End Assembly/Soft Pegging
C) Level of Pegging (Set the required level In BOM to which Pegging should be performed.)
D) Hard Pegging
E) Full Pegging
F) Critical Resource Pegging
G) Soft Pegging
H) End Assembly Pegging
5. Your client Is set up to run a Constrained plan ABC. This plan Is set up with the Enforce Demand Due Dates option.
The plan ABC Is run successfully and the outcome of the plan is ready.
Which three options can be expected as recommendations out of the plan ABC run?
A) One of the demands is going to be fulfilled late.
B) A Job is scheduled to use two resource units when there is only one resource unit available.
C) Planning time fence is respected.
D) A purchase requisition Is scheduled within the lead-time set for the Item.
E) One machine resource Is overloaded.
質問と回答:
質問 # 1 正解: A、C、D、F | 質問 # 2 正解: D | 質問 # 3 正解: A | 質問 # 4 正解: D、E、G、H | 質問 # 5 正解: B、D、E |