質問 1:Select the typeof use case scenarioindicatedby the redline in the followingpicture.
A. Alternate
B. Main Success
C. Secondary
D. Exception
正解:A
解説: (Topexam メンバーにのみ表示されます)
質問 2:Which term means executing the systematic quality activities to determine if the quality processes are being followed and whether they are satisfying the project quality needs?
A. Quality Assurance
B. Process Improvement
C. Quality Control
D. Quality Planning
正解:C
質問 3:What is the purpose of the Project Execution and Control Phase?
A. To provide an adequate foundation for the Project Management Plan.
B. To provide adequate visibility into actual progress so that management can take effective actions when necessary.
C. To successfully transition from the sales team to the delivery team.
D. To prove the solution described in the scope document meets the project requirements.
正解:B
解説: (Topexam メンバーにのみ表示されます)
質問 4:Using the 2 x 2Urgency/ImportanceMatrix below, select the use case withhighestpriority.
A. UC10
B. UC2
C. UC6
D. UC8
E. UC4
正解:A
質問 5:What is the basis for the Project Management Plan [PMP]?
A. the project deliverables
B. the resourcing plan
C. the Project Framework
D. the procurement plan
正解:C
解説: (Topexam メンバーにのみ表示されます)
質問 6:Tasks in the Project Execution and Control phase are ongoing. How often are they executed?
A. In each iteration
B. Five times per iteration
C. In each Phase
D. As needed
E. At the beginning of each week
正解:A
質問 7:According to the recommended training for this exam, what is the definition of a project?
A. A sequence of tasks for there is a Statement work
B. Anything for which there is an executed contact
C. A sequence of tasks with a beginning and an end, bound by time, responses, and desired results
D. A sequence of tasks with a specified end date
正解:C
質問 8:Which is true about planning in OUM?
A. The project workplan should be scaled up, rather than tailored down, to the level of discipline appropriate be the identified risks and requirements.
B. The project workplan must be developed from the full OUM work breakdown schedule.
C. The project workplan should be scaled down, rather than tailored up, to the level of discipline appropriate to the identified risks and requirements.
D. The project workplan should be rigorously conformed to an existing set of work products.
正解:A
解説: (Topexam メンバーにのみ表示されます)
弊社のOracle 1Z0-466を利用すれば試験に合格できます
弊社のOracle 1Z0-466は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社は1Z0-466問題集の質問と答えが間違いないのを保証いたします。
この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のOracle 1Z0-466を利用すれば、君は一回で試験に合格できます。
Oracle 1Z0-466 認定試験の出題範囲:
トピック | 出題範囲 |
---|
トピック 1 | - Applying Method Principles
|
トピック 2 | - Manage work| risk and scope
|
トピック 3 | - Plan a project and related documentation
|
トピック 4 | |
参照:http://www.oracle.com/partners/en/products/applications/project-lifecycle-exam-1z0-466/index.html
TopExamは君に1Z0-466の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
弊社は無料Oracle 1Z0-466サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料1Z0-466サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこの1Z0-466問題集は自分に適するかどうか判断して購入を決めることができます。
1Z0-466試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
弊社は失敗したら全額で返金することを承諾します
我々は弊社の1Z0-466問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のOracle 1Z0-466を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
一年間の無料更新サービスを提供します
君が弊社のOracle 1Z0-466をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたOracle 1Z0-466をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のOracle 1Z0-466を持っていることを保証します。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社の1Z0-466問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。