HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

IBM 000-608 問題集

000-608

試験コード:000-608

試験名称:IBM WebSphere Process Server V7.0 Deployment

最近更新時間:2024-11-01

問題と解答:全65問

000-608 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥6599 

無料問題集000-608 資格取得

質問 1:
WebSphere Process Server (WPS) V7.0 introduces a new Service Component Architecture (SCA) container. Which of the following changes in the architecture result in improved performance?
A. Code generation, validation, and packaging is fully covered during the application deployment.
B. There is no dependency for an EJB container for WPS V7.0 applications.
C. Applications for WPS V6.2 and previous releases are automatically migrated to V7.0 during deployment.
D. The new Business Object Runtime Framework replaces the old Business Object framework.
正解:B

質問 2:
A telecommunications client is interested in using SOA for enterprise applications, and their legacy applications are very critical. Which product can be recommended to help the client use the new services and orchestrate processes along with the existing applications?
A. WebSphere Message Broker
B. WebSphere Service Registry and Repository
C. WebSphere MQ
D. WebSphere Business Services Fabric
正解:D

質問 3:
A customer new to WebSphere Process Server has promoted some Java developers to the WebSphere Integration Developer team. The developers want to monitor the use of some of the non-technology adapters (e.g., SAP and JD Edwards). The developers have started to design a database schema to persist the metrics and develop Java code to track the adapter usage. What should the deployment professional suggest to the WebSphere Integration Developer team?
A. Use the adapter monitoring provided by PMI and do not develop the Java code or the database.
B. Ensure the Java code connects to the database using a JNDI entry.
C. Ensure the Java code stores time in Universal Standard time, not local time.
D. Add a data element in the Business Objects to track start and stop times.
正解:A

質問 4:
A retail company has the requirement to make frequent changes to a long running MyProcessDiscount business process as newer versions of that process are introduced due to changing business needs. What approach should a deployment professional adopt to meet this requirement?
A. Stop the older version of the MyProcessDiscount process template from the Integrated Solutions Console (ISC), install the application containing the newer version of the business process template.
B. Use the Business Process Choreographer Explorer, if you see any running instances of older version of MyProcessDiscount process template, wait till all the instances of that version of the template are completed, then remove the older version of the business process template and install the newer version of the business process template.
C. Install the application containing the newer version of MyProcessDiscount process template, then using the Business Process Choreographer Explorer, monitor the state of the running process instances and, when execution is in the appropriate place in the flow of the business process, select the business process instances based on the older template only to migrate to the newer version.
D. Use the Business Process Choreographer Explorer, select all the running instances with name MyProcessDiscount business process, then choose the Migrate option to migrate all instances to the currently valid version of the business process template.
正解:C

質問 5:
A deployment professional is installing an application which uses business processes in a clustered WebSphere Process Server environment. The Business Process Choreographer (BPC) container has previously been configured. During which phase of the installation is the application validated?
A. During the installation phase on the node agent.
B. During the application start phase on the application server.
C. During the installation phase on the deployment manager.
D. During the configuration phase on the application server.
正解:C

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社の000-608問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

TopExamは君に000-608の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

弊社のIBM 000-608を利用すれば試験に合格できます

弊社のIBM 000-608は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社は000-608問題集の質問と答えが間違いないのを保証いたします。

000-608無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のIBM 000-608を利用すれば、君は一回で試験に合格できます。

弊社は無料IBM 000-608サンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料000-608サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこの000-608問題集は自分に適するかどうか判断して購入を決めることができます。

000-608試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

一年間の無料更新サービスを提供します

君が弊社のIBM 000-608をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたIBM 000-608をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のIBM 000-608を持っていることを保証します。

弊社は失敗したら全額で返金することを承諾します

我々は弊社の000-608問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のIBM 000-608を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

IBM WebSphere Process Server V7.0 Deployment 認定 000-608 試験問題:

1. An application has been deployed on a clustered WebSphere Process Server environment using the Remote Messaging and Remote Support pattern. To handle asynchronous invocation problems, the store-and-forward capability is enabled for several applications. During the test phase one of the target services invoked by the application became unavailable. Which of the following statements is TRUE regarding recovery of events?

A) A single failed event has been generated by one of the cluster members when the target
service became unavailable. Resubmit all failed
events once the target service is available.
B) Multiple failed events might have been created by different cluster members. All failed events
must be resubmitted before the Store and
Forward widget in the Business Space is set to Forward mode.
C) No manual intervention is necessary. If the store-and-forward feature is activated on a single
cluster member due to a target service outage,
the remaining cluster members will take over and complete the invocation transactions.
D) No manual intervention is necessary. WebSphere Process Server will poll the target service
and once it is available, all remaining sequenced
events will be automatically processed.


2. WebSphere Process Server (WPS) V7.0 introduces a new Service Component Architecture (SCA) container. Which of the following changes in the architecture result in improved performance?

A) Code generation, validation, and packaging is fully covered during the application deployment.
B) There is no dependency for an EJB container for WPS V7.0 applications.
C) Applications for WPS V6.2 and previous releases are automatically migrated to V7.0 during deployment.
D) The new Business Object Runtime Framework replaces the old Business Object framework.


3. A development team has scheduled a new series of test cycles for their applications. For the planned load test the following requirements have been specified by the team to complete the test and identify runtime problems. The team must monitor the number of failed asynchronous invocations; status of the messaging engines and deployed application modules. Which approach will support the team to gather the required information during the test cycle?

A) Add all members of the development to the monitor security role for the administrative console and provide login information.
B) Enable the Failed Event Manager and the Service Integration Bus (SIB) Browser application for remote access and provide login information to the development team.
C) Create a Business Space with the respective system administration widgets and provide login information to the development team.
D) Enable tracing for the application and messaging engine hosting servers and provide access for the trace files to the development team.


4. An application is processing a sales order between two SCA modules. The business process requires that all invocations between the modules are performed in a specific order. A runtime problem on one of the asynchronous invocations caused the application to fail and the processing stopped for one of the transactions. What should a deployment professional do to solve the problem?

A) Enable the store-and-forward feature for the application and the events will be processed automatically if the runtime problem is solved.
B) Identify the failed sequenced event related to the asynchronous invocation of the calling module and resubmit the event.
C) Identify the failed business process invoke activity and restart the activity to resubmit the event and complete the transaction.
D) Use the esAdmin tool to manually release all locks of the failing application module and restart the application.


5. A customer new to WebSphere Process Server has promoted some Java developers to the WebSphere Integration Developer team. The developers want to monitor the use of some of the non-technology adapters (e.g., SAP and JD Edwards). The developers have started to design a database schema to persist the metrics and develop Java code to track the adapter usage. What should the deployment professional suggest to the WebSphere Integration Developer team?

A) Use the adapter monitoring provided by PMI and do not develop the Java code or the database.
B) Ensure the Java code connects to the database using a JNDI entry.
C) Ensure the Java code stores time in Universal Standard time, not local time.
D) Add a data element in the Business Objects to track start and stop times.


質問と回答:

質問 # 1
正解: B
質問 # 2
正解: B
質問 # 3
正解: C
質問 # 4
正解: B
質問 # 5
正解: A

000-608 関連試験
A2040-921 - Assessment: IBM WebSphere Portal 7.0 Migration and Support
C2180-607 - IBM WebSphere Process Server V7.0, Integration Development
A2040-915 - Assessment: IBM WebSphere Portal 7.0 Solution Development
P9530-039 - IBM WebSphere MQ Technical Sales Mastery Test v2
C2180-608 - IBM WebSphere Process Server V7.0 Deployment
連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。