HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

IBM 000-608 問題集

000-608

試験コード:000-608

試験名称:IBM WebSphere Process Server V7.0 Deployment

最近更新時間:2025-05-06

問題と解答:全65問

000-608 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥6599 

無料問題集000-608 資格取得

質問 1:
A development team has scheduled a new series of test cycles for their applications. For the planned load test the following requirements have been specified by the team to complete the test and identify runtime problems. The team must monitor the number of failed asynchronous invocations; status of the messaging engines and deployed application modules. Which approach will support the team to gather the required information during the test cycle?
A. Add all members of the development to the monitor security role for the administrative console and provide login information.
B. Enable the Failed Event Manager and the Service Integration Bus (SIB) Browser application for remote access and provide login information to the development team.
C. Create a Business Space with the respective system administration widgets and provide login information to the development team.
D. Enable tracing for the application and messaging engine hosting servers and provide access for the trace files to the development team.
正解:C

質問 2:
A new integration developer has just deployed a new business module to the test cell using WebSphere Integration Developer (WID). The new integration developer does not have access to the Integrated Solutions Console (ISC) for the test cell, so the integration developer used the servers panel in WID to deploy the business module and got no errors. The new integration developer is complaining that any output in the SystemOut.log cannot be seen. What is the likely problem? The business module was:
A. not started.
B. not deployed using serviceDeploy tool.
C. not deployed using the ejbdeploy tool.
D. packaged in a JAR and not an EAR.
正解:A

質問 3:
A deployment professional has been asked to review the backup plan of a WebSphere Process Server (WPS) Network Deployment installation with a standard Remote Messaging and Remote Support two node cell. The deployment professional has noticed that the databases are backed up on a different cycle and separate from the transaction logs. Predict the consequences during a database recovery from backup.
A. WPS must be restarted in recovery mode to automatically synchronize database and transaction logs.
B. WPS transaction logs will have to be manually edited to remove transaction that occurred after the backup.
C. WPS will automatically synchronize database and transaction logs during normal startup.
D. WPS may not start up normally because the database and transaction logs backup are not synchronized.
正解:D

質問 4:
A company needs to transform messages between its internal supply chain management and financial applications. The format of data exchanged between these two applications vary considerably. Which supporting service component would implement this requirement?
A. Relationships
B. Mediation Flows
C. Business Rules
D. Interface Maps
正解:B

質問 5:
A company has implemented a simple business integration application in WebSphere Process Server to send updates synchronously to the backend database as part of the nightly batch process. It has been observed that on a daily basis the updates are lost when the database is down for a couple of minutes due to routine maintenance, and the only way to recover is to ask the application team to re-send the updates. What should a deployment professional do so that the updates are not lost and to enable recovery in case of backend system failures?
A. Use asynchronous database communication and resubmit the events using the Failed Event Manager.
B. Ask the application team to ensure the reliability qualifier is set to "Best Effort".
C. Monitor the SCA application bus system exception destination for failed events.
D. Adjust the "Maximum Failed Deliveries" to 1 since it is a known recurring outage and modify the "Retry interval" to adjust the number of minutes for outage.
正解:A

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社の000-608問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

TopExamは君に000-608の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

弊社のIBM 000-608を利用すれば試験に合格できます

弊社のIBM 000-608は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社は000-608問題集の質問と答えが間違いないのを保証いたします。

000-608無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のIBM 000-608を利用すれば、君は一回で試験に合格できます。

弊社は無料IBM 000-608サンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料000-608サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこの000-608問題集は自分に適するかどうか判断して購入を決めることができます。

000-608試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

一年間の無料更新サービスを提供します

君が弊社のIBM 000-608をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたIBM 000-608をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のIBM 000-608を持っていることを保証します。

弊社は失敗したら全額で返金することを承諾します

我々は弊社の000-608問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のIBM 000-608を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

IBM WebSphere Process Server V7.0 Deployment 認定 000-608 試験問題:

1. An application has been deployed on a clustered WebSphere Process Server environment using the Remote Messaging and Remote Support pattern. To handle asynchronous invocation problems, the store-and-forward capability is enabled for several applications. During the test phase one of the target services invoked by the application became unavailable. Which of the following statements is TRUE regarding recovery of events?

A) A single failed event has been generated by one of the cluster members when the target
service became unavailable. Resubmit all failed
events once the target service is available.
B) Multiple failed events might have been created by different cluster members. All failed events
must be resubmitted before the Store and
Forward widget in the Business Space is set to Forward mode.
C) No manual intervention is necessary. If the store-and-forward feature is activated on a single
cluster member due to a target service outage,
the remaining cluster members will take over and complete the invocation transactions.
D) No manual intervention is necessary. WebSphere Process Server will poll the target service
and once it is available, all remaining sequenced
events will be automatically processed.


2. A company has deployed many applications accessing the same backend services. Many of the applications share the same WSDL and Business Objects. New applications to be deployed in the near future will use updated backend service definitions. In addition, the memory usage has dramatically increased over the last deployments and may prevent new application deployments on the same environment. Which of the following recommendations would a deployment professional MOST likely provide?

A) The development team should identify common artifacts used by the application. A shared library can be deployed independently and referenced by the applications.
B) The system administrator can deploy new applications including all libraries needed. During the deployment the libraries of other applications with the needed WSDL and Business Objects can be referenced as a shared library.
C) The environment must be prepared for new applications by increasing the heap size of the servers or new servers must be added to the environment to share the workload.
D) The development team must review the applications and provide a single module for the backend access. Shared WSDL and Business Objects can be deployed with the new application.


3. An integration developer has informed the deployment professional that the new business integration module being worked on is using Common Event Infrastructure (CEI) events to monitor performance during stress testing, and that the plan is to remove the CEI event emitting code before going to production. What concerns should the deployment professional raise with the integration developer?

A) Is dynamic monitoring used to emit CEI events?
B) CEI events are performance heavy and will invalidate the stress testing results once removed.
C) Is static monitoring used to emit CEI events?
D) CEI is designed for business monitoring, and is not designed for performance monitoring.
E) The business integration module will be changed to remove the CEI emitting events when going from stress testing to production.


4. A highly available WebSphere Process Server clustered environment comprises of cluster1 with two members, clusterMemberA and clusterMemberB. cluster1 has been added as a member of a bus. The two cluster members host a message producer application, App1, and a message consumer application App2 which needs to consume messages produced by App1. App2 must receive messages in a sequential manner maintaining the order of message delivery. During peak load, the clusterMemberA is most active taking significant performance impact while clusterMemberB is almost idle and is only experiencing about 25% of the overall activity. Identify the steps the deployment professional should take to reconfigure the messaging infrastructure so that the load is balanced more evenly among both cluster members of cluster1.

A) Create a secondary two member cluster cluster2 with messaging only capabilities. Add cluster2 as a bus member and create an additional active message engine on cluster2 and detach cluster1 from the bus .
B) Create a secondary two member cluster cluster2 with messaging only capabilities. Add cluster2 as a bus member and detach the cluster1 from the bus.
C) Create another server with messaging only capabilities. Add this server as a bus member and detach the cluster1 from the bus.
D) Create an additional messaging engine on cluster1 so that each cluster member hosts an active messaging engine for an even load distribution.


5. A deployment professional is doing a manual creation of database tables for a Business Space runtime in a WebSphere Network Deployment runtime. The database is to be hosted on a remote DB2 instance. Which of the following must be done prior to beginning the creation of the database tables?

A) Use the Integrated System Console widget to define the IP address of the database server.
B) Execute the profile_root/dbscripts/BusinessSpace/preconfigDsh script.
C) Create profiles and configure servers or clusters for Business Space.
D) Stop all business process applications running in the cell to which Business Space is being installed.


質問と回答:

質問 # 1
正解: B
質問 # 2
正解: A
質問 # 3
正解: B、D
質問 # 4
正解: B
質問 # 5
正解: C

000-608 関連試験
A2050-723 - Assessment: IBM WebSphere Commerce V7.0 Application Development
P9530-039 - IBM WebSphere MQ Technical Sales Mastery Test v2
A2180-606 - Assessment: IBM WebSphere Business Modeler Advanced Edition V7.0, Business Analysis and Design
A2050-724 - Assessment: IBM WebSphere Commerce V7.0, System Administration
A2040-921 - Assessment: IBM WebSphere Portal 7.0 Migration and Support
連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。