HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

BCS RE18 問題集

RE18

試験コード:RE18

試験名称:BCS Practitioner Certificate in Requirements Engineering 2018

最近更新時間:2024-12-13

問題と解答:全80問

RE18 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥5999 

無料問題集RE18 資格取得

質問 1:
A project, which was initiated several months ago, has been impacted by the following changes:
1. An organizational restructure has altered the responsibilities of
the stakeholders.
2. A new chief executive has been appointed, who has new ideas
regarding the immediate focus of the project.
Which of the following attributes in a requirements catalogue entry would need to be updated to reflect these changes?
A. Owner, source.
B. Priority, owner, version history.
C. Rationale, priority, source.
D. Version history, author, rationale.
正解:B

質問 2:
Spicer, an herbs and spices company, is building a new website to grow its business online. A meeting is taking place to prioritize the requirements for inclusion in the first release of the website, which will take place in July. The second release of the website is planned for September.
Miranda, the company buyer is the owner for a requirement that states: 'The system shall provide screens for adding new products'. Miranda informs the meeting that new products are added to the system every three months and that she needs this functionality to be in place before the system goes live. In her view, it is a mandatory requirement.
Peter, who is developing the system, has stated that he can do a one-off upload of all the products into the database ready for launch in July, meaning that the website can initially go live without the 'add new product' functionality.
What priority is Miranda's requirement for the July release?
A. Must have
B. Want to have
C. Could have
D. Should have
正解:A

質問 3:
A zoo is in the process of introducing a new IT system to improve its processes and drive greater efficiency in its operations. It has received permission from the board of directors for a phased approach to introduce new business functionality and to replace manual processes with digital solutions.
The key areas for inclusion in the first phase are a new animal health monitoring system, which will allow the zookeepers to utilize the power of data analytics to monitor and proactively manage the health of the animals. It will also provide them with a way of accurately recording the birth of new animals and record loans of animals to other zoos around the world.
On the public-facing side, the project will provide customers with an adoption scheme, which will raise much-needed funds.
A business analyst has constructed a use case diagram for the zoo:

The following potential statements have been made about the diagram:
(A) The diagram is a correct representation of the scenario.
(B) There are aspects of the scenario which are incorrectly represented in the diagram.
(C) There are aspects of the scenario which are incorrectly omitted
from the diagram.
(D) The notation used in the diagram is incorrect.
Which of them is/are true?
A. A
B. B
C. B and C
D. C and D
正解:B

質問 4:
ChemCo Ltd has initiated a project to consider changes in its pension scheme.
Paul works in the marketing department and is enrolled in the pension scheme. He has been invited to attend a pension scheme project session designed to elicit requirements, understand opinions on the level of service, and consider how it could be improved in the future. On arrival at the session, Paul recognizes people from other departments, who are all customers of the pension scheme.
In which type of session is Paul about to participate?
A. Focus group
B. Scenario analysis
C. Activity sampling
D. Workshop
正解:A

質問 5:
A set of requirements for a new retail app has been prioritised using MoSCoW as follows:
REQ#1: (S)
REQ#2: (C)
REQ#3: (S)
REQ#4: (M)
REQ#5: (M)
REQ#6: (C)
REQ#7: (W)
All M, S and C. requirements have been approved for inclusion in the first iteration of the project.
Which of these requirements constitute the minimum usable subset of the first iteration?
A. REQ#1, REQ#2, REQ#3, REQ#4, REQ#5, RE#Q6 and REQ#7.
B. REQ#1, REQ#3, REQ#4 and REQ#5.
C. REQ#4 and REQ#5.
D. REQ#1, REQ#2, REQ#3, REQ#4, REQ#5 and REQ#Q6.
正解:C

質問 6:
Mel is a business analyst who has returned to a project she first worked on two years ago. This time, she is going to be helping with the benefits management aspects of the project.
As part of her re-familiarisation with the project, she is keen to understand how some of the requirements she elicited were finally implemented.
Which type of traceability is Mel seeking?
A. Horizontal 'forwards to'.
B. Vertical 'downwards'.
C. Horizontal 'backwards from'.
D. Vertical 'upwards'.
正解:A

質問 7:
A project to introduce an online annual leave request system for a major international consultancy business has started. It has been designed as a benefit to the consultants, but will also offer significant opportunities to improve project planning in the organisation.
The following requirements have been identified by stakeholders:
REQ#1: The consultant shall be able to request a period of leave. REQ#2: The system must conform to data protection legislation. REQ#3: The system shall produce reports indicating consultant availability. REQ#4: Requests for leave can only be made Monday to Friday, 10.00hrs to 16.00 hours.
Which of the following represents the CORRECT categorisation of these requirements for the project management business area?
A. 1x Functional, 2 x Non-functional, 1 x General.
B. 1 x Functional, 1 x Non-functional, 1 x General, 1 x Technical.
C. 2 x Functional, 1 x Non-functional, 1 x General.
D. 2 x Functional, 2 x Non-functional.
正解:C

質問 8:
A set of requirements for a new online health information portal have been prioritized using MoSCoW:
REQ#1: (S)
REQ#2: ((C)
REQ#3: (S)
REQ#4: (M)
REQ#5: (M)
REQ#6: ((C)
REQ#7: (W)
Only the minimum usable subset was approved for inclusion in the first iteration of the project.
After the build for the first iteration began, it was estimated there was enough time to add two additional requirements, without negative impact on the project schedule.
Which two requirements will now be added to the first iteration build?
A. REQ#6 and REQ#7
B. REQ#2 and REQ#6
C. REQ#1 and REQ#3
D. REQ#4 and REQ#5
正解:C

BCS RE18 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Define The Term ‘Requirements’ And The Characteristics Of A Requirement
トピック 2
  • Define The Term Stakeholder
  • Project Manager
  • Solution Architect
トピック 3
  • Explain The Key Roles Of The Business Stakeholders During Requirements Engineering
トピック 4
  • Explain The Rationale For Requirements Engineering And The Application Of The Requirements Engineering Framework
トピック 5
  • Explain The Key Roles Project Stakeholders During Requirements Engineering
トピック 6
  • Interpret A Given Scenario, Identify Stakeholders And Describe Their Contribution To Requirements Engineering
トピック 7
  • Show Understanding Of The Rationale For The Requirements Hierarchy
トピック 8
  • Business Policy (General) Requirements
  • Technical Policy Requirements
  • Non-Functional Requirements
トピック 9
  • Ross-Check Requirements For Consistency And Completeness
  • Interpret A Given Scenario To Develop A Context Diagram
トピック 10
  • Business Objectives
  • Project Objectives
  • Constraints (Budget, Timescale, Standards)
  • Authority Or Sponsor
  • Resources
  • Assumptions
トピック 11
  • Agile And Linear Development Approachesenerate Questions In Order To Clarify A Requirement And Remove Ambiguity
トピック 12
  • Describe The Principles And Application Of The Elicitation Techniques
トピック 13
  • Explain The Categories Within The Hierarchy
  • Business Policy (General) Requirements
トピック 14
  • Describe How It Is Applied In Requirements Engineering

参照:https://www2.bcs.org/certifications/ba/requirements-engineering

一年間の無料更新サービスを提供します

君が弊社のBCS RE18をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたBCS RE18をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のBCS RE18を持っていることを保証します。

TopExamは君にRE18の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

弊社は失敗したら全額で返金することを承諾します

我々は弊社のRE18問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のBCS RE18を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のRE18問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

弊社のBCS RE18を利用すれば試験に合格できます

弊社のBCS RE18は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はRE18問題集の質問と答えが間違いないのを保証いたします。

RE18無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のBCS RE18を利用すれば、君は一回で試験に合格できます。

弊社は無料BCS RE18サンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料RE18サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのRE18問題集は自分に適するかどうか判断して購入を決めることができます。

RE18試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

RE18 関連試験
BA15 - Foundation Certificate in Business Analysis
BAP18 - BCS Practitioner Certificate in Business Analysis Practice 2018 Exam
FBA15 - BCS Foundation Certificate in Business Analysis
PC-BA-FBA - BCS Foundation Certificate in Business Analysis V4.0
PC-BA-FBA-20 - BCS Foundation Certificate in Business Analysis V4.0
連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。