HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

ISO ISOIEC20000LI 問題集

ISOIEC20000LI

試験コード:ISOIEC20000LI

試験名称:Beingcert ISO/IEC 20000 Lead Implementer Exam

最近更新時間:2024-12-17

問題と解答:全123問

ISOIEC20000LI 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥6599 

無料問題集ISOIEC20000LI 資格取得

質問 1:
Based on scenario 2. which principle of information security was NOT compromised by the attack?
A. integrity
B. Availability
C. Confidentiality
正解:A

質問 2:
Company X restricted the access of the internal auditor of some of its documentation taking into account its confidentiality. Is this acceptable?
A. Yes. confidential information should not be increased by internal auditors
B. Yes. it is up to the company to determine what an internal auditor can access
C. No. restricting the internal auditor's access to offices and documentation can negatively affect the internal audit process
正解:C

質問 3:
An organization that has an ISMS in place conducts management reviews at planned intervals, but does not retain documented information on the results. Is this in accordance with the requirements of ISO/IEC 27001?
A. Yes. ISO/IEC 27001 does not require organizations to document the results of management reviews
B. No, ISO/IEC 27001 requires organizations to document the results of management reviews
C. Yes. ISO/IEC 27001 requires organizations to document the results of management reviews only if they are conducted ad hoc
正解:B
解説: (Topexam メンバーにのみ表示されます)

質問 4:
Diana works as a customer service representative for a large e-commerce company. One day, she accidently modified the order details of a customer without their permission Due to this error, the customer received an incorrect product. Which information security principle was breached in this case7
A. Integrity
B. Availability
C. Confidentiality
正解:A
解説: (Topexam メンバーにのみ表示されます)

質問 5:
An organization has justified the exclusion of control 5.18 Access rights of ISO/IEC 27001 in the Statement of Applicability (SoA) as follows: "An access control reader is already installed at the main entrance of the building." Which statement is correct'
A. The justification is not acceptable, because it does not reflect the purpose of control 5.18
B. The justification for the exclusion of a control is not required to be included in the SoA
C. The justification is not acceptable because it does not indicate that it has been selected based on the risk assessment results
正解:A
解説: (Topexam メンバーにのみ表示されます)

TopExamは君にISOIEC20000LIの問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

弊社は無料ISO ISOIEC20000LIサンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料ISOIEC20000LIサンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのISOIEC20000LI問題集は自分に適するかどうか判断して購入を決めることができます。

ISOIEC20000LI試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

弊社は失敗したら全額で返金することを承諾します

我々は弊社のISOIEC20000LI問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のISO ISOIEC20000LIを利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のISOIEC20000LI問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

弊社のISO ISOIEC20000LIを利用すれば試験に合格できます

弊社のISO ISOIEC20000LIは専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はISOIEC20000LI問題集の質問と答えが間違いないのを保証いたします。

ISOIEC20000LI無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のISO ISOIEC20000LIを利用すれば、君は一回で試験に合格できます。

一年間の無料更新サービスを提供します

君が弊社のISO ISOIEC20000LIをご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたISO ISOIEC20000LIをお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のISO ISOIEC20000LIを持っていることを保証します。

ISO Beingcert ISO/IEC 20000 Lead Implementer 認定 ISOIEC20000LI 試験問題:

1. Scenario 3: Socket Inc is a telecommunications company offering mainly wireless products and services. It uses MongoDB. a document model database that offers high availability, scalability, and flexibility.
Last month, Socket Inc. reported an information security incident. A group of hackers compromised its MongoDB database, because the database administrators did not change its default settings, leaving it without a password and publicly accessible.
Fortunately. Socket Inc. performed regular information backups in their MongoDB database, so no information was lost during the incident. In addition, a syslog server allowed Socket Inc. to centralize all logs in one server. The company found out that no persistent backdoor was placed and that the attack was not initiated from an employee inside the company by reviewing the event logs that record user faults and exceptions.
To prevent similar incidents in the future, Socket Inc. decided to use an access control system that grants access to authorized personnel only. The company also implemented a control in order to define and implement rules for the effective use of cryptography, including cryptographic key management, to protect the database from unauthorized access The implementation was based on all relevantagreements, legislation, and regulations, and the information classification scheme. To improve security and reduce the administrative efforts, network segregation using VPNs was proposed.
Lastly, Socket Inc. implemented a new system to maintain, collect, and analyze information related to information security threats, and integrate information security into project management.
Based on scenario 3. which information security control of Annex A of ISO/IEC 27001 did Socket Inc.
implement by establishing a new system to maintain, collect, and analyze information related to information security threats?

A) Annex A 5.13 Labeling of information
B) Annex A 5 7 Threat Intelligence
C) Annex A 5.5 Contact with authorities


2. Scenario 4: TradeB. a commercial bank that has just entered the market, accepts deposits from its clients and offers basic financial services and loans for investments. TradeB has decided to implement an information security management system (ISMS) based on ISO/IEC 27001 Having no experience of a management
[^system implementation, TradeB's top management contracted two experts to direct and manage the ISMS implementation project.
First, the project team analyzed the 93 controls of ISO/IEC 27001 Annex A and listed only the security controls deemed applicable to the company and their objectives Based on this analysis, they drafted the Statement of Applicability. Afterward, they conducted a risk assessment, during which they identified assets, such as hardware, software, and networks, as well as threats and vulnerabilities, assessed potential consequences and likelihood, and determined the level of risks based on three nonnumerical categories (low, medium, and high). They evaluated the risks based on the risk evaluation criteria and decided to treat only the high risk category They also decided to focus primarily on the unauthorized use of administrator rights and system interruptions due to several hardware failures by establishing a new version of the access control policy, implementing controls to manage and control user access, and implementing a control for ICT readiness for business continuity Lastly, they drafted a risk assessment report, in which they wrote that if after the implementation of these security controls the level of risk is below the acceptable level, the risks will be accepted Based on the scenario above, answer the following question:
The decision to treat only risks that were classified as high indicates that Trade B has:

A) Accepted other risk categories based on risk acceptance criteria
B) Evaluated other risk categories based on risk treatment criteria
C) Modified other risk categories based on risk evaluation criteria


3. Scenario 4: TradeB. a commercial bank that has just entered the market, accepts deposits from its clients and offers basic financial services and loans for investments. TradeB has decided to implement an information security management system (ISMS) based on ISO/IEC 27001 Having no experience of a management
[^system implementation, TradeB's top management contracted two experts to direct and manage the ISMS implementation project.
First, the project team analyzed the 93 controls of ISO/IEC 27001 Annex A and listed only the security controls deemed applicable to the company and their objectives Based on this analysis, they drafted the Statement of Applicability. Afterward, they conducted a risk assessment, during which they identified assets, such as hardware, software, and networks, as well as threats and vulnerabilities, assessed potential consequences and likelihood, and determined the level of risks based on three nonnumerical categories (low, medium, and high). They evaluated the risks based on the risk evaluation criteria and decided to treat only the high risk category They also decided to focus primarily on the unauthorized use of administrator rights and system interruptions due to several hardware failures by establishing a new version of the access control policy, implementing controls to manage and control user access, and implementing a control for ICT readiness for business continuity Lastly, they drafted a risk assessment report, in which they wrote that if after the implementation of these security controls the level of risk is below the acceptable level, the risks will be accepted Based on scenario 4, what type of assets were identified during risk assessment?

A) Business assets
B) Primary assets
C) Supporting assets


4. Based on scenario 2. which principle of information security was NOT compromised by the attack?

A) integrity
B) Availability
C) Confidentiality


5. Which of the following is NOT part of the steps required by ISO/IEC 27001 that an organization must take when a nonconformity is detected?

A) React to the nonconformity, take action to control and correct it. and deal with its consequences
B) Evaluate the need for action to eliminate the causes of the nonconformity so that it does not recur or occur elsewhere
C) Communicate the details of the nonconformity to every employee of the organization and suspend the employee that caused the nonconformity


質問と回答:

質問 # 1
正解: B
質問 # 2
正解: A
質問 # 3
正解: C
質問 # 4
正解: A
質問 # 5
正解: C

連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。