HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

ISQI CTAL_TM_001 問題集

CTAL_TM_001

試験コード:CTAL_TM_001

試験名称:ISTQB Certified Tester Advanced Level - Test Manager

最近更新時間:2025-03-04

問題と解答:全128問

CTAL_TM_001 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥5999 

無料問題集CTAL_TM_001 資格取得

質問 1:
Assume that you are working for a company that has maintained and tested a car parking permit system for many years. The system holds the name and address of permit holders and automatically writes to the permit holder with a form to renew or cancel their permit each year.
The test plan states the following:
"since the system is considered a stable system. Boundary Value Analysis is the only test case design technique that needs to be applied during testing" Consider the following change that was detailed in the Requirements Specification for a replacement to an existing parameter held within the system;
* The specified renewal date for each permit must be not be after 31 st January 2020. Which one of the following is a valid test condition that satisfies both the requirement and the test plan?
SELECT ONE OPTION
A. Input the dates either side of and including 31/01/2020, and select tests from the regression pack relating to the renewal date and printing only.
B. Input the date 31/01 /20 in the wrong field to see what happens, and run the whole of the regression test pack.
C. Input the date 01/02/2020 and confirm this is not accepted. and select tests from the regression test back relating to the renewal date only
D. Input the date 01/02/2020 and confirm this is not accepted. and select tests from the regression testback relating to the renewal date only
E. Input a date in an invalid format e.g. 31 FEB 2020, and select tests from the regression pack relating to renewal date, policy holder's name, address and printing.
正解:A

質問 2:
You have been promoted to Test Manager within your company. Your new manager states that your test team utilized a risk-based test approach for the last release but in production, a number of serious failures in lightly tested areas have occurred.
What would be your first action prior to the start of the next test phase for the next release? [3]
A. Request functional requirements be prioritized in order of importance to the stakeholder.
B. Review the test cases executed from the previous release.
C. Review the production defects and determine if they are valid.
D. Ensure you have the correct stakeholders' participation during the risk assessment process
正解:D
解説: (Topexam メンバーにのみ表示されます)

質問 3:
'Safe as Houses' is a company that specialises in home security software, including alarm systems, surveillance cameras and other forms of deterrence.
It is currently developing the software for a device which simulates an active television, producing sound and light images that suggest someone is home watching the television. 'Safe as Houses' recently won a lucrative contract to supply the software to Smart Alarms', who will be manufacturing the hardware devices Sound will be created using actual television and film archives, licensed through a third-party supplier, 'Silver Sound Ltd'. A user interface will be developed in house to allow the customer to choose sound tracks.
The software will be delivered as a programme of work, consisting of three projects. Project 1 will develop the software for the light images. Project 2 will develop the sound system and Project 3 will integrate the two using hardware prototypes supplied from 'Smart Alarms'. The programme will conclude with 'Smart Alarms' performing User Acceptance testing in usability labs.
The 'Safe as Houses' test team has experience in testing alarm and surveillance systems but lacks experience in testing light imagery software. The organisational test policy includes the following objectives:
1 Exploratory testing should be used to augment more formal, structured testing within constraints of time and budget
2. Test automation tools should be purchased and employed to maximise the breadth and efficiency of regression testing The Programme risk register currently includes the following risks:
RISK1 Working prototypes will be delivered late to the integration test environments RISK 2 A delay in signing the contract with 'Silver Sound Ltd' will impact the programme schedule RISK 3 Inexperience in testing light imagery software will cause major defects to be missed RISK 4 The user interface software for the sound systems will be delivered late into testing Refer to SCENARIO 2 - The IT Director for 'Safe as Houses' is recruiting a Programme Test Manager and has been provided with a skills matrix for four prospective candidates. The matrix shows the skill level (5 being highest. 1 lowest) for each candidate:

Consider which of these skills are key for a Programme Test manager in this scenario. Based on these, which candidate would be the most suitable?
SELECT ONE OPTION
A. Bill
B. John
C. Sarah.
D. Mary.
正解:B

質問 4:
As the Test Manager for an agile project how would you BEST plan and guide the testing activities during development? SELECT ONE OPTION
A. Ensure testers are separated from the developers to provide an independent set of functional tests
B. Ensure all tests are written and reviewed by the developers to ensure they reflect the code being developed
C. Ensure testers are integrated into the development process, helping to review and develop automated unit tests
D. Ensure testers provide training to developers to help them write a set of auto-mated unit tests
正解:C

質問 5:
During what step of the Fundamental Test Process should you define the methods to be used to collect test metrics? [1]
A. Closure
B. Planning
C. Analysis
D. Execution
正解:B
解説: (Topexam メンバーにのみ表示されます)

質問 6:
You are the Test Manager of a risk-based testing effort. You develop the following graph to show residual risk. Assume that "Risks mitigated" represents passed tests and "Risks not mitigated" represents failed tests and other discovered failures.
Which of the following answers best represents what the graph shows? [3]

A. Project is at risk due to the number of failed tests
B. Project is behind schedule based on bug fix rate
C. Project is ahead of schedule due to number of risks addressed
D. Project is on schedule based on total number of test cases executed
正解:A
解説: (Topexam メンバーにのみ表示されます)

質問 7:
Your test team is in the process of completing final regression testing one week before the release date. One of your staff has just uncovered a critical defect that causes data corruption.
What should you do? [2]
A. Update the weekly status charts and change the project status to red
B. Write a high priority defect and follow the escalation communication plan as defined in your test plan
C. Update the risks in your test plan to cover data corruption issues and update your test cases to be sure you test for this in the future
D. Write a high priority defect and call the business stakeholders to warn them about it
正解:B
解説: (Topexam メンバーにのみ表示されます)

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のCTAL_TM_001問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

弊社は失敗したら全額で返金することを承諾します

我々は弊社のCTAL_TM_001問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のISQI CTAL_TM_001を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

弊社は無料ISQI CTAL_TM_001サンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料CTAL_TM_001サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのCTAL_TM_001問題集は自分に適するかどうか判断して購入を決めることができます。

CTAL_TM_001試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

一年間の無料更新サービスを提供します

君が弊社のISQI CTAL_TM_001をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたISQI CTAL_TM_001をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のISQI CTAL_TM_001を持っていることを保証します。

TopExamは君にCTAL_TM_001の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

ISQI CTAL_TM_001 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • The Context of Testing: This section assesses the abilities of Quality Assurance Leads in understanding the context of testing. It compares stakeholders' interests in testing, explains the importance of their knowledge, and summarizes test management activities for various software development lifecycles, test levels, and test types. Analyzing a project to determine activities that emphasize test planning, monitoring, and control is also included.
トピック 2
  • Improving the Test Process: This section targets the skills of Process Improvement Specialists in improving the test process. It involves explaining how to use the IDEAL model, summarizing model-based and analytical-based improvement approaches, and implementing a project or iteration retrospective to evaluate test processes and discover testing areas for improvement.
トピック 3
  • Risk-Based Testing: This domain evaluates the competencies of Risk Analysts in applying risk-based testing. It explains measures to respond to risks, techniques for identifying risks related to product quality, factors determining risk levels, and selecting test activities to mitigate risks. Differentiating between heavyweight and lightweight techniques, and providing examples of success metrics are also summarized.
トピック 4
  • The Test Team: This section focuses on the skills of Team Leads regarding the test team. It includes examples of typical skills needed by test team members, analyzing a project context to determine required skills, explaining techniques for skill assessments, differentiating between approaches for developing skills, explaining skills required to manage a test team, and examples of motivating factors.
トピック 5
  • The Test Process: This section measures the skills of Test Managers and covers summarizing test planning, monitoring, control, and completion activities. Understanding the steps and considerations within each of these phases of the testing lifecycle is essential. A key skill here involves "summarizing test planning activities.

参照:https://www.istqb.org/certifications/certified-tester-advanced-level-test-management-ctal-tm-v3-0/

弊社のISQI CTAL_TM_001を利用すれば試験に合格できます

弊社のISQI CTAL_TM_001は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はCTAL_TM_001問題集の質問と答えが間違いないのを保証いたします。

CTAL_TM_001無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のISQI CTAL_TM_001を利用すれば、君は一回で試験に合格できます。

CTAL_TM_001 関連試験
CTFL_UK - ISTQB Certified Tester Foundation Level (Syllabus 2011, GB only)
CTAL-TM-KR - ISTQB Certified Tester Advanced Level - Test Manager (CTAL_TM_001 Korean Version)
CTAL-TTA-001 - ISTQB Certified Tester Advanced Level - Technical Test Analyst (CTAL-TTA_001)
CTFL-PT - ISTQB Certified Tester Foundation Level-Performance Testing
CTAL_TM_001-German - ISTQB Certified Tester Advanced Level - Test Manager (CTAL_TM_001 Deutsch Version)
連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Adobe
Apple
Avaya
CheckPoint
Citrix
CIW
CompTIA
EC-COUNCIL
EXIN
FileMaker
IBM
Juniper
Lotus
Lpi
Network Appliance
OMG
Oracle
PMI
SNIA
Symantec
VMware
XML Master
Zend-Technologies
The Open Group
H3C
F5
3COM
BEA
Dell
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。