HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

ISQI CTAL-TM_Syll2012 問題集

CTAL-TM_Syll2012

試験コード:CTAL-TM_Syll2012

試験名称:ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]

最近更新時間:2024-11-17

問題と解答:全132問

CTAL-TM_Syll2012 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥5999 

無料問題集CTAL-TM_Syll2012 資格取得

質問 1:
Reviews
You are the Test Manager of a project that adopts a V-model with four formal levels of testing: unit, integration, system and acceptance testing.
On this project reviews have been conducted for each development phase prior to testing, which is to say that reviews of requirements, functional specification, high-level design, low-level design and code have been performed prior to testing.
Assume that no requirements defects have been reported after the release of the product.
Which TWO of the following metrics do you need in order to evaluate the requirements reviews in terms of phase containment effectiveness?
Number of correct responses: 2
K32 credits
A. Total number of defects attributable to requirements, found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing
B. Time to conduct the requirements review
C. Total number of defects attributable to requirements found during unit, integration, system and acceptance testing
D. Total number of defects found during functional specification review, high-level design review, low-level design review, code review, unit testing, integration testing, system testing and acceptance testing
E. Number of defects found during the requirements review
正解:A,E

質問 2:
Reviews
Consider the following list of statements about audits and management reviews:
I. Audits are usually more effective than management reviews at finding defects II. Audits and management reviews have the same main goals, the only difference is related to the roles and level of formality III. A typical outcome of an audit includes observations and recommendations, corrective actions and a pass/fail assessment IV. An audit is not the appropriate mechanism to use at the code review in order to detect defects prior to dynamic testing Which of the following statements is true?
Number of correct responses: 1
K21 credit
A. III. and IV. are true; I and II are false;
B. II. and III are true; I. and IV. are false;
C. I, III and IV are true; II. is false;
D. I. and III. are true; II. and IV. are false;
正解:A

質問 3:
Test Management
You are the Test Manager of a new project that will have three formal levels of testing: unit, integration and system testing. The testing strategy you decide to adopt a blend of risk-based testing and reactive testing strategies.
Which of the following answers describes the most consistent example of implementation of this test strategy during the execution of the system tests?
Number of correct responses: 1
K21 credit
A. Your test team executes system tests under the guidance of a sample of users throughout the system test phase
B. Your test team executes scripted tests designed and implemented before the execution of the system test phase, to cover the identified product risks. It also performs exploratory testing sessions throughout the system test phase
C. Your test team autonomously performs some exploratory testing sessions and, at the very end of the system testing phase, it also executes more system tests under the guidance of a sample of users
D. Your test team executes exploratory tests following a session-based test management approach throughout the system test phase
正解:B

質問 4:
You are not confident with the assessment of the risk level and you suspect that it will be possible to find high-priority bugs in low-risk areas.
Furthermore the period for test execution is very short. Your goal is to test all the product risks in a risk-based way, while assuring that each product risk gets at least some amount of testing.

Which of the following answers describes the best test execution schedule in this scenario?
Number of correct responses: 1
K32 credits
A. T1, T2, T3, T4, T5, T6, T7, T8, T9, T10
B. T10, T8, T6, T4, T2, T9, T7, T5, T3, T1
C. T1, T3, T5, T7, T9, T2, T4, T6, T8, T10
D. T10, T9, T8, T7, T6, T5, T4, T3, T2, T1
正解:C

質問 5:
The following is the unique "critical" quality risk item that has been identified:
CR-RSK-1. The GUI of the application might accept non-integer values for the input field designed to get the number of bottles from the user Test analysis for system testing has just begun and the following test conditions have been identified:
TC-SEL-2. Test the selection of the package sizes
TC-SEL-4. Test wrong numbers of bottles for an order
TC-CR-RSK-1. Test the accepted values from the input field designed to get the number of bottles from the user Assume that you have used traceability to determine the logical test cases that cover all the requirements and the single risk item identified in that scenario.
Which of the following is a positive logical test that is complete and correct, and covers the REQ-SEL-4 requirement?
Number of correct responses: 1
K32 credits
A. Select a 6-bottles package, then try to insert 7 bottles
B. Select a 6-bottles package, then try to insert 7 bottles; verify that no error messages are displayed
C. Select a 6-bottles package, then try to insert 7 bottles; verify that the "Invalid number of bottles" message is displayed
D. Select a 6-bottles package, then try to insert 5 bottles; verify that no error messages are displayed
正解:C

質問 6:
Testing Process
Consider an information system of a Pay-Tv company based on a SOA architecture.
The integrated system currently consists of three core systems:
- a CRM (Customer Relationship Management) system
- a BRM (Billing and Revenue Management) system
- a CAS (Conditional Access System) system
all of them communicating with SOA Middleware.
You have been asked to manage the testing activities for the integration of two additional off-the-shelf systems from two different vendors: a SMS (Short Message Service) server and an IVR (Interactive Voice Response) system.
Assume that there is a high likelihood that the two off-the-shelf systems will be low-quality and that you have a clear proof that the testing performed by the two vendors on their systems has been unsystematic and unprofessional. This obviously leads to higher quality risk for the overall integrated system.
You are the Test Manager of this project. Your main goal is to plan for testing activities to mitigate this risk.
Which of the following answers best describes the test activities (assuming it is possible to perform all of them) you should plan for?
Number of correct responses: 1
K43 credits
A. You should plan for adequate re-testing of both the systems followed by a system integration test and an end-to-end test of the overall integrated system
B. You should plan for two levels: a system integration test and an end-to-end test of the overall integrated system
C. You should directly plan for a single end-to-end test focused on end-to-end tests of the overall integrated system without an acceptance test of the two off-the-shelf systems
D. You should plan for an informal and minimal acceptance test of the two off-the-shelf systems and then a single end-to-end test of the overall integrated system
正解:A

質問 7:
Most managers in your company consider the efforts of your test team valuable, while others see comprehensive testing as an unnecessary cost overhead to the SDLC.
What action could the Test Manager take to quantify the value of testing to the organization? [3]
A. Develop metrics that illustrate planned and actual testing hours.
B. Demonstrate the role QA has in similar size organizations.
C. Determine the cost of external failures.
D. Review the Test Plan with the management team.
正解:C
解説: (Topexam メンバーにのみ表示されます)

質問 8:
Test Management
Assume you are managing the system testing phase of a project.
The system test execution period is scheduled to twenty weeks.
All tests are manual tests. You are following a risk-driven test approach.
During the last staff meeting the project manager tells you new deadlines that will not allow completion of all the system tests.
Which of the following would you expect to be the best way to respond to this situation?
Number of correct responses: 1
K21 credit
A. Automate all remaining tests
B. No action is needed, test as much as possible in the remaining time period
C. Remove testers from your test team, so that they can be assigned to other projects
D. Prioritize executing the tests for the highest product risks and track these risks
正解:D

質問 9:
A chart showing the trend in the lag time from defect reporting to resolution during system testing is also available. The chart shows that the daily closure period is consistently and significantly above the rolling closure period for a long period of the system testing phase.
Almost all defects found during system testing have been related to the system as a whole, not related to single units or integrations issues. Almost all quality risks have been addressed during the unit and integration testing phase and no residual quality risks were present in the integrated system. This has been confirmed by exploratory testing sessions performed during system testing, targeted at finding defects in these quality risk areas.
Based on the given information only, which one of the following areas would you expect to be considered more in the retrospective meeting in order to be improved?
Number of correct responses: 1
K33 credits
A. The defect management process
B. The requirements review
C. The quality risk analysis process
D. The system design and architecture design reviews
正解:A

ISQI CTAL-TM_Syll2012 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Includes people in roles such as testers test analysts test engineers
トピック 2
  • User acceptance testers and software developers
トピック 3
  • Advanced Level qualify cation is also appropriate for anyone who wants a deeper understanding of software testing.

参照:https://isqi.org/bd/istqb-certified-tester-advanced-level-test-manager#/26-language-german/28-exam-public_exam_session/32-time_extension-no/64-2try_exam-na

一年間の無料更新サービスを提供します

君が弊社のISQI CTAL-TM_Syll2012をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたISQI CTAL-TM_Syll2012をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のISQI CTAL-TM_Syll2012を持っていることを保証します。

弊社は無料ISQI CTAL-TM_Syll2012サンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料CTAL-TM_Syll2012サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのCTAL-TM_Syll2012問題集は自分に適するかどうか判断して購入を決めることができます。

CTAL-TM_Syll2012試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

弊社は失敗したら全額で返金することを承諾します

我々は弊社のCTAL-TM_Syll2012問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のISQI CTAL-TM_Syll2012を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

弊社のISQI CTAL-TM_Syll2012を利用すれば試験に合格できます

弊社のISQI CTAL-TM_Syll2012は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はCTAL-TM_Syll2012問題集の質問と答えが間違いないのを保証いたします。

CTAL-TM_Syll2012無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のISQI CTAL-TM_Syll2012を利用すれば、君は一回で試験に合格できます。

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のCTAL-TM_Syll2012問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

TopExamは君にCTAL-TM_Syll2012の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

CTAL-TM_Syll2012 関連試験
CTAL-TM_001-KR - ISTQB Certified Tester Advanced Level - Test Manager (CTAL_TM_001 Korean Version)
CTFL-Foundation - ISTQB Certified Tester Foundation Level
CTAL-TTA_001-Deutsch - ISTQB Certified Tester Advanced Level - Technical Test Analyst (CTAL-TTA-001 Deutsch Version)
CTAL-TA_Syll2012 - ISTQB Certified Tester Advanced Level - Test Analyst (Syllabus 2012)
CTAL-TM-KR - ISTQB Certified Tester Advanced Level - Test Manager (CTAL_TM_001 Korean Version)
連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。