質問 1:A tool to map and understand the flow of materials from supplier to customer, focusing on not only understanding the current state of process and flow but also specifying the value-added and non-value-added time of all process steps, is called.
正解:
Value stream mapping
質問 2:Which of the following is an advantage of VMI?
A. The customer can usually force additional concessions from the VMI supplier
B. Lead-times are increased
C. MRP system operating costs decrease
D. Suppliers can leverage better information to reduce inventory levels.
正解:D
質問 3:1. Flow of work through the shop is varied and depends on the design of a particular product. As orders are processed, they will take more time at once workstation than at another. Thus, the work flow is not balanced.
2. Machinery and workers must be flexible enough to do the variety of work. Machinery and work centers are usually grouped according to the function they perform (e.g. all lathes in one department).
3. Throughput times are generally long. Scheduling work to arrive just when needed is difficult, the time taken by an order at each work center varies, and work queues before work centers, causing long delays in processing. Work-in-process inventory is often large.
4. The capacity required depends on the particular mix of products being built and is difficult to predict. These are the characteristics of:
A. Project manufacturing
B. All of these
C. Flow manufacturing
D. Intermittent manufacturing
正解:A
質問 4:A company normally ships to a customer by rail at a cost of $500 per load. The transit time is fourteen days. The goods can be shipped by truck for $700 per load and transit time of four day. If transit inventory cost is $35 per day, what does it cost to ship each way?
A. Rail: $990 and Truck: $ 840
B. Rail: $900 and Truck: $ 890
C. Rail: $980 and Truck: $ 880
D. Rail: $970 and Truck: $ 870
正解:A
質問 5:A work center consists of 4 machines each working a 16-hour day for 5 days a week. What is the weekly available time?
A. 320 hours per week
B. 230 hours per week
C. 300 hours per week
D. 350 hours per week
正解:A
質問 6:With the explosive growth in just-in-time (JIT) concepts, the supplier-customer partnership concept grew as a result many changes in their relationships came including:
A. Speed of accurate information flow
B. Mutual analysis for cost reduction
C. Need for rapid delivery
D. Mutual product design
正解:A
質問 7:The Question mark represents:
A. Cost of goods solved
B. None of these
C. Payables
D. Inventories
正解:D
質問 8:From a technical perspective, Six Sigma is achieved when the process capability is equal to at least 1.
A. False
B. True
正解:A
質問 9:For effective planning:
A. There must be a balance between priority and capacity
B. Priority should be given more importance than capacity
C. None of these
D. Capacity should be given more importance than priority
正解:A
TopExamは君にCPIMの問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のCPIM問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
弊社のAPICS CPIMを利用すれば試験に合格できます
弊社のAPICS CPIMは専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はCPIM問題集の質問と答えが間違いないのを保証いたします。
この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のAPICS CPIMを利用すれば、君は一回で試験に合格できます。
一年間の無料更新サービスを提供します
君が弊社のAPICS CPIMをご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたAPICS CPIMをお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のAPICS CPIMを持っていることを保証します。
弊社は失敗したら全額で返金することを承諾します
我々は弊社のCPIM問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のAPICS CPIMを利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
弊社は無料APICS CPIMサンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料CPIMサンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのCPIM問題集は自分に適するかどうか判断して購入を決めることができます。
CPIM試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
APICS CPIM 認定試験の出題範囲:
トピック | 出題範囲 |
---|
トピック 1 | - Basics of Supply Chain Management
|