質問 1:From which external sources can existing process maps be imported into IBM WebSphere Business Modeler to enhance the business process design?
A. IBM WebSphere Integration Developer
B. Microsoft Visio
C. IBM Rational Data Architect
D. IBM WebSphere Business Compass
E. IBM WebSphere Service Registry and Repository
正解:B,D
質問 2:A process analyst has imported a project into the workspace and now has the following error present in the Errors View: "The business item "Widget" is based on the parent template "Widget Template," which exists outside of the reference group for this project." How can the process analyst resolve this error?
A. Open the "Widget" business item and remove the Parent template reference. Save the "Widget" business item to remove the error.
B. Create a new business item template called "Widget Template" in a separate project. Update the project reference group to include the project that "Widget Template." Save the "Widget" business item to remove the error.
C. Create a new business item template called "Widget Template" in the same project as the "Widget" business item. Save the "Widget" business item to remove the error.
D. Create a new business item template called "Widget Template" in the same project as the "Widget" business item. Update the project reference group and remove the external project reference. Save the "Widget" business item to remove the error.
正解:A
質問 3:Refer to the Exhibit.
The process analyst needs to simulate the process with the following business attributes: Total number of customer information business item received for the process = 100 Business items arrived at a rate of 1 per minute. How should the inputs business items be modeled in the simulation profile?
A. Set in the Profile Attribute - Input Tab the following:
-Total number of tokens = 100
-
Time trigger: Time between bundle = 1 minute
B. Set in the Profile Attribute - Input Tab the following:
-Number of tokens per bundle = 100
-
Time trigger: Time between bundle = 1 minute
C. Start with the process input instead of the start node. Set in the Profile Attribute - Input Tab the following:
-Number of tokens per bundle = 100
-Time trigger: Time between bundle = 1 minute
D. Start from the process input instead of the start node. Set in the Profile Attribute - Input Tab the following:
-Total number of tokens = 100
-
Time trigger: Time between bundle = 1 minute
正解:D
質問 4:The payment process has the following requirement: "A new policy requires additional information from certain customers based on a score system whose rating will be variable based on federal regulations." Identify the pattern that is the BEST choice for modeling this requirement.
A. Global task that uses a service to implement the score evaluation.
B. Business rules task follow by a multiple choice decision to indicate the outcome.
C. Local task with a loop that runs while the information is being collected.
D. Human task that uses a form that the teller completes.
正解:B
質問 5:Refer to Exhibit.
A process analyst has performed simula-tion upon a business process and is analyzing the resource allocation within the process. After running the Process Resource Allocation Dynamic Analysis Report, it is observed that there is significant Average Shortage Duration on the "Wash Car" task within the process for both allocated bulk resources. The process analyst observes that the Water bulk resource has been defined as "Consumable" and has a sufficient Available Quantity value defined in order to support simula-tion input token generation. However, other tasks within this process also consume water. The Washer bulk resource is not allocated for any other activity in the process Based on this information, what conclusions can the process analyst draw in regards to reducing the average resource shortage durations?
A. Water is a consumable resource and therefore can not be reused. Uncheck the Water bulk resource's Consumable option to make it reusable. Now, other tasks within the process can reuse the Water resource and will not have to wait to allocate it. Therefore, the Average Shortage Duration will decrease for the Water bulk resource.
B. Water is a consumable resource and therefore can not be reused. Once no more units of Water are available to a process simula-tion, the lack of availability is reflected in the Average Shortage Duration. Increasing the available units for both the Water and Washer resources will reduce the Average Shortage Durations for the task.
C. Water is a consumable resource and therefore can be reused. Because of this, other tasks that are using the Water units are preventing the Wash Car activity from allocating units of Water to perform the task. This lack of availability is reflected in the Average Shortage Duration. Increasing the available units for the Water resource will reduce the Average Shortage Duration for the task.
D. There is no Average Shortage Duration for the Water bulk resource. The resource shortage occurs because of unavailable Washers, and this shortage duration is also reflected for the Water bulk resource as the task waits for all resources to become available before starting. Increasing the number of available Washer resources will reduce the Average Shortage Duration reflected for both Washers and Water.
正解:D
質問 6:Which of the following measures would provide details about a single run of a process?
A. Aggregate Metrics
B. Pre-defined Key Performance Indicators (KPIs)
C. Instance Metrics
D. Average Process Completion Duration
正解:C
質問 7:A business analyst needs to validate external process touch points using Business Designer. Which of the following will be useful in the validation?
A. Process Advisor
B. Process maps
C. Process walkthrough
D. Business vocabularies
E. Process collaborations
正解:B,E
弊社は無料IBM C9550-606サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料C9550-606サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのC9550-606問題集は自分に適するかどうか判断して購入を決めることができます。
C9550-606試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のC9550-606問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
弊社のIBM C9550-606を利用すれば試験に合格できます
弊社のIBM C9550-606は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はC9550-606問題集の質問と答えが間違いないのを保証いたします。
この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のIBM C9550-606を利用すれば、君は一回で試験に合格できます。
IBM C9550-606 認定試験の出題範囲:
トピック | 出題範囲 |
---|
トピック 1 | - Business Process Simulation Analysis and Validation
|
トピック 2 | - Business Process Modeling Concepts
|
トピック 3 | - Business Process Management Concepts and Business Process Modeling Methodologies and Frameworks
|
参照:http://www-03.ibm.com/certify/tests/ovrC9550-606.shtml
弊社は失敗したら全額で返金することを承諾します
我々は弊社のC9550-606問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のIBM C9550-606を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
一年間の無料更新サービスを提供します
君が弊社のIBM C9550-606をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたIBM C9550-606をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のIBM C9550-606を持っていることを保証します。
TopExamは君にC9550-606の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。