質問 1:A BPM application developer is building a case type. The BPM application developer has a
wide range of existing BPM components available and wants to reuse as many of them as possible.
Which BPM implementation types can the BPM application developer use to build case type activities?
A. Script, Subprocess and User Task
B. Linked Process, Subprocess and System Task
C. Script, System Task and User Task
D. Linked Process, Subprocess and User Task
正解:D
質問 2:Which component stores process performance data?
A. Process Server Database
B. Process Center
C. Performance Database
D. Performance Data Warehouse
正解:D
質問 3:Within a tire-production process a legacy system must be integrated, which provides the rim sizes for each available tire. All exceptions are handled in similar manner "except for the ti re" not found exception with the error code "TR001".
How does a BPM application developer implement the exception handling?
The BPM application developer must:
A. Add a specific catch for TR001" to the artifact within the integration service.
B. Add a catch event to the integration service.
C. Log the input and output values within the pre and post statements of the integration service.
D. Add a specific catch for "TR001" and an unspecific catch for other exceptions to the artifact within the integration service.
正解:A
質問 4:A business process application project is starting the service integration playback phase. Which actions should the BPM application developer include in this phase? (choose 2)
A. Identify all the integration points at the business process definition (BPD) level.
B. identify what complex patterns, such as cancellation or pipeline, should be used and implemented.
C. Identify all the data transformations required to send and receive information from the external systems.
D. Define the business actions that need to be enabled in each interface.
E. Evaluate which pre-built integration services in IBM Business Process Manager can be used.
正解:A,E
質問 5:A BPM application developer is working on the following Business Process Definition
(BPD):
Both the BPM administrator and the database administrator have identified performance problems with the current process and they suspect that this is due to the collection of the performance data. Consequently, the process owner has decided to minimize the amount of performance data to be collected for this BPD.
The BPM application developer must track only the following process data:
- Order ID and Authorizer ID variables when an order is authorized
- Order ID and Order Amount variables when an order is placed Given this situation, what must the BPM application developer do to track only the business data required?
A. Create a tracking group for Order ID, Order Amount and Authorizer I Use two intermediate tracking points to mark exactly where the data shouldbe tracked during execution. Only the necessary fields should be selected on each tracking group.
B. Enable auto-tracking and use two intermediate tracking points to specify where the data should be automatically tracked in the BPD.
C. Enable auto-tracking and mark each individual variable as tracked.
D. Create a tracking group for Order ID, Order Amount and Authorizer ID. Use two intermediate tracking points to mark exactly where the data shouldbetracked during execution. Only the necessary fields should be selected on each tracking point.
正解:B,D
質問 6:A BPM application developer is creating a Business Process Definition (BPD) that contains message intermediate events attached to multiple activities. Each of the message intermediate events reference the same undercover agent (UCA). The message must be delivered to the correct process instance and to the correct activity based on business data.
How can the BPM application developer configure the correlation to ensure the message is sent to the correct activity?
The BPM application developer must configure the message intermediate event to correlate on the process instance ID and:
A. filter on the business data using the activity's condition tab.
B. the business data by adding a second correlation variable to the UCA and message intermediate event.
C. add a script to the BPD that invokes the correct activity based on the business data.
D. the business data concatenated into a single variable making it unique for each activity.
正解:C
一年間の無料更新サービスを提供します
君が弊社のIBM C9550-412をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたIBM C9550-412をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のIBM C9550-412を持っていることを保証します。
弊社は無料IBM C9550-412サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料C9550-412サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのC9550-412問題集は自分に適するかどうか判断して購入を決めることができます。
C9550-412試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
TopExamは君にC9550-412の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のC9550-412問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
IBM C9550-412 認定試験の出題範囲:
トピック | 出題範囲 |
---|
トピック 1 | |
トピック 2 | - Error Handling| Debugging and Troubleshooting
|
トピック 3 | - Process and Case Modeling
|
トピック 4 | - User Interface Development
|
トピック 5 | - IBM Business Process Manager Architecture
|
トピック 6 | - Performance Tracking and Reporting
|
トピック 7 | |
参照:https://www-03.ibm.com/certify/exam.html?id=C9550-412
弊社は失敗したら全額で返金することを承諾します
我々は弊社のC9550-412問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のIBM C9550-412を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
弊社のIBM C9550-412を利用すれば試験に合格できます
弊社のIBM C9550-412は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はC9550-412問題集の質問と答えが間違いないのを保証いたします。
この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のIBM C9550-412を利用すれば、君は一回で試験に合格できます。