質問 1:A company needs the BPM analyst to provide a business value and impact assessment to only proceed with processes that align with their corporate strategy. The company's corporate strategy is to begin with small quick win pilots that require low effort and low impact and then scale to large programs that are low effort and high impact.
In the exhibit below, which quadrants contain the processes the BPM analyst should recommend?
A. Top right, top left
B. Bottom left, top left
C. Top right, bottom right
D. Bottom right, top left
正解:B
質問 2:A BPM analyst has built the following process diagram during a process discovery workshop.
Each activity noted above will have a separate Coach displayed in IBM Business Process
Manager V8.0. How would the BPM analyst adjust the diagram to capture this requirement while adhering to best practices for proper process modeling granularity?
A. Add a separate swimlane for each activity in the Developer swimlane.
B. Combine the Developer's 3 activities into a sub-process.
C. Add a separate milestones for each activity in the Developer swimlane.
D. Color each activity with a different color to indicate separate Coaches.
正解:B
質問 3:On a project, the BPM analyst defined the following to identify the Key Performance Indicator (KPI):
The goal of the project was to improve the efficiency of the process.
The concern was that the process was not fast enough.
The Critical to Quality (CTQ) was the speed of the process.
The client was interested in the cycle time of the process.
The time stamps at the beginning and at the end of the process are captured.
-----
Which step did the BPM analyst fail to perform in identifying the KPI?
A. Know the client's Service Level Agreements (SLAs)
B. Know the client objectives
C. Know the process decision makers
D. Know how to define the client's KPI
正解:C
質問 4:During a process discovery session, the business subject matter experts (SMEs) and the
BPM analyst have created the following process for a "3rd Party Grant Writing Process":
The business subject matter experts (SMEs) insist that the review after the "Develop"
activities will be completed outside of the process platform. The process platform will be alerted that the reviews are complete and the process should proceed to the "Archive" activities".
How should the BPM analyst adjust the process so that the business requirements can be captured and a BPM Developer can have enough information to build an executable process?
A. Add a system swimlane and a message event to receive the review message (placed in new swimlane and the "Review" milestone)
B. Add a swimlane to the process diagram for a "Reviewer" role and an activity to accept the reviews (placed in new swimlane and the 'Review' milestone)
C. Combine the "Review" milestone and the "Archive" milestone into "Review and Archive"
D. Insert an Exception event on the process flow between "Complete Grant" and 'Email and Save Grant'
正解:A
質問 5:During process discovery, the business subject matter experts (SMEs) make the following statement about how the process starts: "Today, our users access the database that stores new orders and copy that information manually onto a request form. This form is passed from one participant to another during the process. In our future state, we would like IBM Business Process Manager V8.0 to connect to the database directly, so that we don't have to manually create our request forms." The IT representatives from the client indicate that this should be possible. How should the BPM analyst respond to this?
A. Inform the business SMEs that this is not possible as the process must start with a Human Task.
B. Defer this discussion for the BPM developers.
C. Capture that the process should start systematically and identify high level inputs to the process.
D. Gather all the technical details for this integration.
正解:C
一年間の無料更新サービスを提供します
君が弊社のIBM C9550-275をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたIBM C9550-275をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のIBM C9550-275を持っていることを保証します。
弊社は無料IBM C9550-275サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料C9550-275サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのC9550-275問題集は自分に適するかどうか判断して購入を決めることができます。
C9550-275試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
IBM C9550-275 認定試験の出題範囲:
トピック | 出題範囲 |
---|
トピック 1 | - Process Inventory and Prioritization
|
トピック 2 | - Identify the scope| project goals and critical success factors.
|
トピック 3 | |
トピック 4 | - Build and categorize the process inventory.
|
トピック 5 | - Identify candidate processes for a BPM project.
|
参照:https://www-03.ibm.com/certify/exam.html?id=C9550-275
弊社のIBM C9550-275を利用すれば試験に合格できます
弊社のIBM C9550-275は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はC9550-275問題集の質問と答えが間違いないのを保証いたします。
この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のIBM C9550-275を利用すれば、君は一回で試験に合格できます。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のC9550-275問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
弊社は失敗したら全額で返金することを承諾します
我々は弊社のC9550-275問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のIBM C9550-275を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
TopExamは君にC9550-275の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。