HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

IBM C2180-606 問題集

C2180-606

試験コード:C2180-606

試験名称:IBM WebSphere Business Modeler Advanced Edition V7.0, Business Analysis and Design

最近更新時間:2025-02-18

問題と解答:全110問

C2180-606 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥6599 

無料問題集C2180-606 資格取得

質問 1:
Which of the following business processes are candidates for modeling for compensation?
A. Processing an exception, resolving the database error and terminating the process instance.
B. Determining current inventory, ordering new inventory and stocking the new inventory.
C. Cancelling a flight reservation, refunding purchase price and releasing seats.
D. Calculating a correlation key, updating the business item and restarting the process based on the key.
正解:C

質問 2:
Refer to Exhibit.

A process analyst has performed simula-tion upon a business process and is analyzing the resource allocation within the process. After running the Process Resource Allocation Dynamic Analysis Report, it is observed that there is significant Average Shortage Duration on the "Wash Car" task within the process for both allocated bulk resources. The process analyst observes that the Water bulk resource has been defined as "Consumable" and has a sufficient Available Quantity value defined in order to support simula-tion input token generation. However, other tasks within this process also consume water. The Washer bulk resource is not allocated for any other activity in the process Based on this information, what conclusions can the process analyst draw in regards to reducing the average resource shortage durations?
A. Water is a consumable resource and therefore can not be reused. Uncheck the Water bulk resource's Consumable option to make it reusable. Now, other tasks within the process can reuse the Water resource and will not have to wait to allocate it. Therefore, the Average Shortage Duration will decrease for the Water bulk resource.
B. Water is a consumable resource and therefore can not be reused. Once no more units of Water are available to a process simula-tion, the lack of availability is reflected in the Average Shortage Duration. Increasing the available units for both the Water and Washer resources will reduce the Average Shortage Durations for the task.
C. Water is a consumable resource and therefore can be reused. Because of this, other tasks that are using the Water units are preventing the Wash Car activity from allocating units of Water to perform the task. This lack of availability is reflected in the Average Shortage Duration. Increasing the available units for the Water resource will reduce the Average Shortage Duration for the task.
D. There is no Average Shortage Duration for the Water bulk resource. The resource shortage occurs because of unavailable Washers, and this shortage duration is also reflected for the Water bulk resource as the task waits for all resources to become available before starting. Increasing the number of available Washer resources will reduce the Average Shortage Duration reflected for both Washers and Water.
正解:D

質問 3:
When reviewing the simu-lations results, the process analyst discovered that for each task in the process that has multiple output criteria, the simula-tion engine would make a random selection of an output path, and generate outgoing tokens for each output defined in the output criterion. Which of the following settings was used during the simula-tion?
A. Based on probabilities to multiple paths.
B. Based on an expression.
C. Based on probabilities to a single path.
D. Randomly to a single path.
正解:C

質問 4:
How should the electricity consumption be modeled for a company that has two different consumption rates throughout the day?
A. Create a role for the electricity.
Create a timetable with the two different intervals.
Assign the cost with the timetable to the role.
B. Create a bulk resource for the electricity.
Create a role for the electricity.
Create a timetable with the two different intervals.
Assign the cost to the timetable with each interval.
Assign the role to the bulk resource.
C. Create an individual resource for the electricity.
Create a timetable with the two different intervals.
Assign the cost with the timetable to the individual resource.
D. Create a bulk resource for the electricity.
Create a timetable with the two different intervals.
Assign the cost with the timetable to the bulk resource.
正解:D

質問 5:
A customer has made an internet purchase of two items. After submitting payment, the customer realizes that one of the items is not the one desired and decides to cancel only one item in the order. The company policy permits the customer to return an item with full refund within 10 days of purchase. Identify the BEST option that describes how a process analyst needs to model these requirements in the purchase process.
A. Add a compensation intermediate event to the complete purchase order task, connect a compensation process and a compensation end event to this task.
B. Add a compensation intermediate event to the complete purchase order task, connect a compensation process and a compensation end event to this task, then trigger a new process that cancels the item and completes a refund when the customer cancels one item after 10 days.
C. Add a compensation intermediate event to the complete purchase order task, connect a compensation activity and a compensation end event to this task.
D. Add a compensation intermediate event to the complete purchase order task, connect a compensation activity and a compensation end event to this task, then trigger a new process that cancels the item and completes a refund when the customer cancels one item after 10 days.
正解:D

弊社は無料IBM C2180-606サンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料C2180-606サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのC2180-606問題集は自分に適するかどうか判断して購入を決めることができます。

C2180-606試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

一年間の無料更新サービスを提供します

君が弊社のIBM C2180-606をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたIBM C2180-606をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のIBM C2180-606を持っていることを保証します。

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のC2180-606問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

弊社のIBM C2180-606を利用すれば試験に合格できます

弊社のIBM C2180-606は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はC2180-606問題集の質問と答えが間違いないのを保証いたします。

C2180-606無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のIBM C2180-606を利用すれば、君は一回で試験に合格できます。

IBM C2180-606 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Business Process Simulation Analysis and Validation
トピック 2
  • Business Process Management Concepts and Business Process Modeling Methodologies and Frameworks
トピック 3
  • Business Process Modeling Concepts

参照:http://www-03.ibm.com/certify/tests/ovrC9550-606.shtml

TopExamは君にC2180-606の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

弊社は失敗したら全額で返金することを承諾します

我々は弊社のC2180-606問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のIBM C2180-606を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

C2180-606 関連試験
C2040-920 - IBM WebShpere Portal 7.0 Deployment and Administration
A2050-724 - Assessment: IBM WebSphere Commerce V7.0, System Administration
A2040-921 - Assessment: IBM WebSphere Portal 7.0 Migration and Support
P2090-076 - IBM InfoSphere Master Data Management Server Technical Mastery Test v1
A2050-723 - Assessment: IBM WebSphere Commerce V7.0 Application Development
連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Adobe
Apple
Avaya
CheckPoint
Citrix
CIW
CompTIA
EC-COUNCIL
EXIN
FileMaker
IBM
Juniper
Lotus
Lpi
Network Appliance
OMG
Oracle
PMI
SNIA
Symantec
VMware
XML Master
Zend-Technologies
The Open Group
H3C
F5
3COM
BEA
Dell
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。