HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

IBM A2180-606 問題集

A2180-606

試験コード:A2180-606

試験名称:Assessment: IBM WebSphere Business Modeler Advanced Edition V7.0, Business Analysis and Design

最近更新時間:2024-11-29

問題と解答:全110問

A2180-606 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥5999 

無料問題集A2180-606 資格取得

質問 1:
A local task, called Prepare Package for Customer, needs to be expanded into a process consisting of several tasks, such as Wrap Package and Insert Coupon. These tasks are unique to the Prepare Package for Customer process. What should the local task be converted to?
A. multiple business rule tasks
B. global subprocess
C. local subprocess
D. multiple services
正解:C

質問 2:
Which predefined process report shows the sequence of steps within a process and the relationships of a process to other processes?
A. Process Details Report
B. Process Level Details Report
C. Process Specification Report
D. Process Procedure Report
正解:D

質問 3:
A process analyst has completed a process model and is required to validate it. One of the validations is to ensure that there are no potential situations where a sequence of activities can be repeated indefinitely. Using Static Analysis, how can the process analyst quickly validate that there are no sequence of tasks that can potentially loop endlessly?
A. 1. Run the Paths Unable to be Followed Report.
2. Identify any paths that were not able to be invoked within the process, and locate the preceding construct that connects a downstream activity's output to an upstream activity's input.
B. 1. Run the Activity Throughput Report.
2. Identify the throughput of all activities that deliver more outputs per hour than anticipated.
C. 1. Run the Path Cycles Report.
2. Identify the cycle name assigned to each path cycle in the process and correlate that back to the process model.
D. 1. Run the Activities Unable to Start Report.
2. Identify any activities that were not able to be invoked within the process, locate the preceding construct that connects a downstream activity's output to an upstream activity's input.
正解:C

質問 4:
A process analyst needs to model the flow of a loan application through a process for both documentation and simula-tion. The tasks in the process lead the analyst to believe that the application may change from verified to reviewed and to approved or declined. How should the process analyst model this requirement?
A. Use three separate business item templates to represent the changing states.
B. Use three business item instances to represent the changing states.
C. Use a single business item instance of the loan application with changing states.
D. Use a single business item representing the loan application throughout the process.
正解:D

質問 5:
As part of the modeling for implementation requirements, aggregate metrics defined in the Business Measures view are required to be visible in Business Space. How should a process analyst model an aggregated metric that is based on a user defined function?
A. 1. Define an aggregation function.
2. Define calculation details deferring the instance metric creation.
B. 1. Define an aggregation function.
2. Define an instance metric with a fully specified expression for calculation.
C. 1. Define an instance metric that is based on a user defined business measure template.
2.Define an aggregation function.
3.Base aggregate metric on the instance metric.
D. 1. Define an instance metric with a fully specified expression for calculation.
2.Define an aggregation function.
3.Base aggregate metric on the instance metric.
正解:D

質問 6:
A process analyst needs to model and simulate the following scenario in a business process: In a call center the manager of the department starts to take calls after all the operators are on the phone. How should the scenario be modeled to represent this behavior?
A. Create an operator role and manager individual resource and then allocate them to the Take Call activity. Then simulate the process.
B. Create operator and manager resources and then allocate them to the Take Call activity. Then simulate the process.
C. Create operator and manager roles and then allocate them to the Take Call activity. Then simulate the process.
D. Create operator and manager roles and additional business logic in the model to accomplish this scenario. Then simulate the process.
正解:D

質問 7:
A future state process has been modeled and validated using simula-tion. simula-tion results have indicated that it is optimal and meets process improvement requirements. The process owners have determined the implementation costs for new hardware, development and employee training to support the new process. Using the Process Break Even dynamic analysis report, how can the process analyst determine when the process will start generating a net profit?
A. 1. Specify the anticipated throughput and total process implementation cost for the future state process.
2.The analysis will determine the number of process invocations that must be executed to generate a net profit.
3.Run simula-tion analysis again, setting the value of tokens to be generated to equal the total invocations value provided from the Process Break Even analysis and starting the simula-tion on the process deployment date.
4.Determine the end date and time for the final process instance by running the Process Cases Summary upon the results. This will be the process break even date, after which the process will begin to generate a net profit.
B. 1. Specify the process availability start date, anticipated throughput and total process implementation cost for the future state process.
2. The analysis will determine the process break even date, after which the process will begin to generate a net profit.
C. 1. Specify the total process implementation cost for the future state process.
2.The analysis will determine the process break even date, after which the process will generate a net profit.
3.The analysis will use the simula-tion attribute values for process availability and process throughput as parameters for this calculation.
D. 1. Specify the anticipated throughput and total process implementation cost for the future state process.
2.The analysis will determine the process break even date, after which the process will begin to generate a net profit.
3.Run simula-tion analysis again, setting the value of tokens to be generated to equal the current annual throughput and starting the simula-tion on the next available date.
4.Determine the end date and time for the final process instance by running the Process Cases Summary upon the results. This will be the process break even date, after which the process will begin to generate a net profit.
正解:A

質問 8:
An organization is launching a unified approach for approvals across all its processes. The approval process will be modeled as a service that will be kept in an internal repository. Which element will a process analyst use to model an approval step in a process?
A. A task
B. A business rule task
C. A business service
D. An external service
正解:C

弊社は無料IBM A2180-606サンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料A2180-606サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのA2180-606問題集は自分に適するかどうか判断して購入を決めることができます。

A2180-606試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

一年間の無料更新サービスを提供します

君が弊社のIBM A2180-606をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたIBM A2180-606をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のIBM A2180-606を持っていることを保証します。

IBM A2180-606 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Business Process Modeling Concepts
トピック 2
  • Business Process Simulation Analysis and Validation
トピック 3
  • Business Process Management Concepts and Business Process Modeling Methodologies and Frameworks

参照:http://www-03.ibm.com/certify/tests/ovrC9550-606.shtml

弊社は失敗したら全額で返金することを承諾します

我々は弊社のA2180-606問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のIBM A2180-606を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

弊社のIBM A2180-606を利用すれば試験に合格できます

弊社のIBM A2180-606は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はA2180-606問題集の質問と答えが間違いないのを保証いたします。

A2180-606無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のIBM A2180-606を利用すれば、君は一回で試験に合格できます。

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のA2180-606問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

TopExamは君にA2180-606の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

A2180-606 関連試験
C2040-920 - IBM WebShpere Portal 7.0 Deployment and Administration
A2040-915 - Assessment: IBM WebSphere Portal 7.0 Solution Development
A2180-607 - Assessment: IBM WebSphere Process Server V7.0, Integration Development
C9510-526 - IBM Application Integration Middleware L1 Support Application Development
A2180-181 - Assessment: IBM WebSphere ILOG JRules BRMS v7.1, Application Development
連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。