質問 1:A host has three dual-port network cards. What is the maximum number of vSwitches that can be integrated with the physical network, assuming that network redundancy is not a requirement?
A. 256
B. 3
C. 6
D. 512
正解:C
質問 2:You are a platform designer constructing a physical design from an existing approved logical design. Out of the vendor proposals, there are two proposed solutions that could be used. Which of the following options is the most important factor when making a decision?
A. Project requirements
B. Existing vendor relationships
C. Project budget
D. Community and vendor-based best practices
正解:A
質問 3:The ability to live-migrate all virtual machines between two clusters is a requirement in the customer's design.
Which two clusters and EVC configurations will accomplish this? (Choose two)
A. Cluster 1* ESXi 6.5* Intel Broadwell CPUs* EVC DisabledCluster 2* ESXi 6.5* Intel Broadwell CPUs* EVC Disabled
B. Cluster 1* ESXi 6.5* Intel Broadwell CPUs* EVC Enabled: Intel "Broadwell" GenerationCluster 2* ESXi 6.5* Intel Sandy Bridge CPUs* EVC Enabled: Intel "Sandy Bridge" Generation
C. Cluster 1* ESXi 5.5* AMD Piledriver CPUs* EVC Enabled: AMD OpteronTM "Piledriver" GenerationCluster 2* ESXi 6.5* AMD Steamroller CPUs* EVC Enabled: AMD OpteronTM "Piledriver" Generation
D. Cluster 1* ESXi 6.0* Intel Skylake CPUs* EVC Enabled: AMD OpteronTM "Steamroller" GenerationCluster 2* ESXi 6.5* AMD Steamroller CPUs* EVC Enabled: AMD OpteronTM "Steamroller" Generation
正解:A,C
解説: (Topexam メンバーにのみ表示されます)
質問 4:A company has requested assistance with a new cross-site failover design to support business-critical applications.
* It has two sites when are very well-connected, and latency is less than 5ms round trip.
* The customer requires that its applications be restarted even in the event of a total site failure.
* The applications must be kept online even when migrated during maintenance.
* Storage arrays at either site support both synchronous and asynchronous replication.
Which two options are accurate application requirements for this scenario? (Choose two.)
A. The design must prioritize application availability.
B. The design must ensure application recoverability at the second site.
C. The applications are latency-sensitive.
D. The design must ensure continuous application uptime even during a total site failure.
正解:A,B
解説: (Topexam メンバーにのみ表示されます)
質問 5:You have been tasked with creating a vSphere 6.5 design for an organization. The organization is looking to implement a Virtual SAN into their environment. You have been tasked with determining whether a given Virtual SAN logical design decision meets the technical requirements of their infrastructure.
For each Design Decision on the left drag the red Decision buttons (D1-D8) on the right and place it on the proper Technical Requirement.
NOTE: Not all Design Decisions will be used.
正解:
質問 6:You have been tasked with creating a vSphere 6.5 design for an organization. The customer wants to ensure isolation in the network but does not know when to incorporate physical networks, VLANs and PVLANs.
Evaluate the design requirement and determine the isolation method to satisfy the design.
Match each Design Requirement on the left by dragging the red Requirement buttons (R1-R5) over the text of the appropriate Isolation Method.
NOTE: Multiple Design Requirements may fit each Isolation Method.
正解:

Explanation:
Physical Network separation
R1, R3, R4
VLAN
R2, R4, R5
PVLAN
R2, R3
質問 7:A database administrator is operating a virtual machine (VM) configured with 16 vCPU and 64GB of RAM. A recent performance audit has indicated that this virtual machine is oversized and is using less than 60% of its configured CPU and memory capacity.
* The ESXi host that contains this VM has 2 physical processors with 10 cores per processor, and 128GB of RAM.
* This physical host's architecture is split into two equal NUMA nodes.
Which vCPU and RAM configuration for the VM allows for the most resources, but also provides the performance benefit of local NUMA access?
A. 16 vCPU and 32GB RAM
B. 10 vCPU and 64GB RAM
C. 4 vCPU and 16GB RAM
D. 12 vCPU and 64GB RAM
正解:B
解説: (Topexam メンバーにのみ表示されます)
質問 8:A solution architect has been tasked with designing a new environment that meets the growing needs of a company, and as obtained this information:
* Each new server will use a single 2-port 10Gb Converged Network Adapter (CNA) for both network and storage access.
* The network team has replaced all network equipment with a 10Gb fabric.
* The new environment will host both web servers and Oracle database servers.
* Resources will not be overcommitted under regular operations to mitigate performance issues.
* The business needs a tool to understand application failures.
* $1million has been budgeted for the data center expansion project.
Based on the information obtained, which two statements are risks for the new design? (Choose two.)
A. The Converged Network Adapters may not be able to support both network and storage throughput.
B. The Converged Network Adapters are compatible with vSphere 6.5.
C. The total project costs may be over budget due to not overcommitting resources.
D. The Oracle database servers are configured for high availability.
正解:A,C
質問 9:A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:
* The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.
* The new servers have a 90-day delivery time.
* A data center for disaster recovery has been selected, and it is 20 miles away and connected by MPLS.
* The security team will continue to utilize its current investments and VM Encryption for the new environment.
* The backup team currently uses Data Domain, and reports show an 8:1 compression and deduplication ratio for backups.
Based on the information obtained, which two statements are risks for the new design? (Choose two.)
A. MPLS will be used to connect the two data centers.
B. Current back up space will not be sufficient if using VM Encryption.
C. The Change Advisory Board will approve all changes.
D. The current firewalls will support the additional workloads.
正解:B,D
解説: (Topexam メンバーにのみ表示されます)
弊社は失敗したら全額で返金することを承諾します
我々は弊社の3V0-624問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のVMware 3V0-624を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
一年間の無料更新サービスを提供します
君が弊社のVMware 3V0-624をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたVMware 3V0-624をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のVMware 3V0-624を持っていることを保証します。
TopExamは君に3V0-624の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
弊社のVMware 3V0-624を利用すれば試験に合格できます
弊社のVMware 3V0-624は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社は3V0-624問題集の質問と答えが間違いないのを保証いたします。

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のVMware 3V0-624を利用すれば、君は一回で試験に合格できます。
弊社は無料VMware 3V0-624サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料3V0-624サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこの3V0-624問題集は自分に適するかどうか判断して購入を決めることができます。
3V0-624試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社の3V0-624問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
VMware 3V0-624 認定試験の出題範囲:
トピック | 出題範囲 |
---|
トピック 1 | - Determine Appropriate Computer Resources For A Vsphere 6.X Physical Design
|
トピック 2 | - Build Availability Requirements Into A Vsphere 6.X Logical Design
|
トピック 3 | - Gather And Analyze Business Requirements
- Gather And Analyze Application Requirements
|
トピック 4 | - Section 1. Create A Vsphere 6.5 Conceptual Design
|
トピック 5 | - Build Manageability Requirements Into A Vsphere 6.X Logical Design
|
トピック 6 | - Build Recoverability Requirements Into A Vsphere 6.X Logical Design
|
トピック 7 | - Determine Virtual Machine Configuration For A Vsphere 6.X Physical Design
|
トピック 8 | - Determine Risks, Requirements, Constraints, And Assumptions
|
トピック 9 | - Build Performance Requirements Into A Vsphere 6.X Logical Design
|
トピック 10 | - Build Security Requirements Into A Vsphere 6.X Logical Design
|
トピック 11 | - Create A Vsphere 6.X Physical Design From An Existing Logical Design
|
トピック 12 | - Determine Data Center Management Options For A Vsphere 6.X Physical Design
|
参照:https://www.vmware.com/education-services/certification/vcap6-5-dcv-design-exam.html